Quarterly Activities Report
FOR THE PERIOD ENDED 31 MARCH 2024
Bannerman Energy Ltd (ASX: BMN, OTCQX: BNNLF, NSX: BMN) (Bannerman or the Company)
is pleased to report on strong progress during the quarter, as it advances preparedness for the targeted
development phase of the Etango Uranium Project (Etango Project or Etango) and demonstrated
Etango’s superior leverage to, and scalability with, higher uranium price outlooks through delivery of
the Etango-XP/XT Scoping Study.
HIGHLIGHTS
•
•
•
Etango-XP/XT Scoping Study completed, evaluating two future phase options to
each produce 95.2 Mlbs U3O8 over life of mine
‒
Etango-XP: expansion in throughput capacity to 16 Mtpa post construction
and ramp-up of base-case Etango-8 mine, to increase average annual
production from 3.5 Mlbs (Etango-8) to 6.7 Mlbs U3O8 post expansion.
‒
Etango-XT: extension of operating life from 15 years (Etango-8) to 27 years
without any expansion in throughput capacity.
‒
Focus to remain on Etango-8 development, which is a highly attractive
stand-alone project.
‒
Ability to enact the XP or XT plans, post-delivery of the initial Etango-8
development, affords substantial real option value across price outcomes.
Key Etango Project workstreams
‒
Front End Engineering and Design (FEED) highly advanced and on target to
complete during Q2 2024.
‒
Early works program progressing and detailed design commenced.
‒
Offtake marketing and financing programs advancing steadily.
Key executive and Board changes enacted, positioning for development
‒
Proven project builder, Gavin Chamberlain, appointed as CEO (previously
COO) and Brandon Munro moved to Executive Chairman (focussed on
corporate affairs and capital/investor markets interface).
‒
Alison Terry appointed Lead Independent Director with Ronnie Beevor
retiring from the Board.
•
Bannerman admitted to S&P/ASX 300, effective 18 March 2024.
•
Substantial cash balance of A$31.7M at quarter end and zero debt.
•
Long-term uranium price reached a 15-year high of US$80/lb during the quarter,
reflecting an ongoing positive market outlook for uranium in 2024.
Bannerman Executive Chairman, Brandon Munro, said:
“The strong progression in project workstreams during the quarter steadily advanced the fully-permitted
Etango project towards construction, in parallel with financing and offtake marketing workstreams, as
we drive towards being in a position to take a positive Final Investment Decision. We were particularly
pleased to demonstrate, via the Etango-XP/XT Scoping Study, the long-term optionality afforded by
our large-scale Etango resource and a clear pathway towards becoming a 6.7 Mlbs pa producer.”
Bannerman Energy Ltd
Suite 7, 245 Churchill Avenue, Subiaco, Western Australia 6008
PO Box 1973, Subiaco, Western Australia 6008
W bannermanenergy.com
T +61 8 9381 1436
E info@bannermanenergy.com
Etango Uranium Project (Bannerman 95%)
Etango-8 FEED Activities
FEED continued to progress on schedule and budget and is expected to be completed in Q2 2024.
The detailed engineering design activities have commenced to position the Etango so that execution
can commence as soon as a positive Final Investment Decision (FID) is taken.
Process Engineering: All heap leach and ion exchange test work is complete, and improvements are
being included in the process design. The Dry Plant process simulation was finalised, and vendor
information was included for the main mechanical equipment. The mass and water balance, and piping
and instrument diagrams for the dry plant have been completed, with good progress being made on
the Wet Plant section.
Mechanical Engineering: Mechanical packages have all been received back from the market, and
adjudications of the structural, mechanical, and piping packages have been completed. Mechanical
equipment sizing and detailing of layouts based on certified vendor information is on track.
Electrical, Instrumentation and Control: The single-line diagrams are complete and the load lists
have been updated with the latest equipment loads. Optimisation of the operational technology
selection and system architecture is proceeding.
Civil, Infrastructure and Earthworks: Packages for bulk earthworks and bulk concrete have been
adjudicated and the final recommendation has been made for award. The ripios dump design
optimisation is on track to incorporate the selected vendor conveyor solution. A surface water
management study was commissioned to review the current design and ensure any potential flood
mitigation measures are effective.
Early Construction Works: The early works contracts for the construction water supply and the mine
access road are on schedule to achieve the planned completion date of July 2024.
Financing
During the quarter, Bannerman advanced its financing activities for the Etango Project.
The Company is evaluating and progressing various funding sources, including conventional project
debt, as well as potential offtake and joint venture opportunities with strategic counterparties who can
add value to the Etango Project.
As previously advised, Bannerman has appointed Azure Capital and Vermilion Partners (both global
affiliates of French financial services institution Natixis) to advise on and assist with the execution of
the optimal funding mix for Etango.
Bannerman remains committed to establishing a highly robust financial base for the Etango Project.
The Company’s focus is on closely aligning its strategic financial planning with its development and
operational goals, thereby ensuring the long-term success and sustainability of Etango.
Offtake Marketing
During the quarter, Bannerman advanced its product marketing initiatives, including further meetings
with target offtake counterparties and nuclear industry participants. The Company’s overarching
product marketing strategy continues to be centred on, and driven by, a detailed understanding of utility
requirements and preferences.
Bannerman’s well-established position with respect to offtake marketing is that the Company will not
diminish the long-term underlying value of Etango by committing to contracting its planned uranium
output on price (and other terms) that it considers unrepresentative of long-term market fundamentals
and producer opportunity. With yellowcake term contract liquidity and pricing continuing to build
momentum during the quarter in line with tightening uranium market fundamentals, the threshold for
undertaking such contracting activities is now significantly closer to being reached.
Page 2 of 8
Etango-XP and Etango-XT Scoping Study
On 13 March 2024, Bannerman announced the completion of a Scoping Study evaluating future higher
throughput and operating life cases for the Etango Project. Two future phase options were evaluated:
a post ramp-up expansion in throughput capacity to 16 Mtpa (Etango-XP) or an extension of operating
life to 27 years (Etango-XT).
Bannerman remains fully committed to the timely development of its base-case 8 Mtpa Etango
development (Etango-8), which was the subject of a Definitive Feasibility Study (DFS) (refer
Bannerman ASX release dated 6 December 2022, Etango-8 Definitive Feasibility Study) and
subsequent FEED workstreams. The Etango-8 Project is a highly attractive standalone project.
The Scoping Study evaluation of the Etango-XP and Etango-XT cases was undertaken to demonstrate
the ready technical and economic viability of subsequent expansion and/or life extension options for
Etango post successful construction and ramp-up of the base-case Etango-8 Project.
Key outcomes include:
Etango-XP (mine and plant throughput expanded to 16 Mtpa from operational Year 5):
•
•
•
•
Life of Mine (LOM) U3O8 output of 95.2 Mlbs over 16 years (Etango-8 DFS: 52.6 Mlbs
over 15 years)
Annual average U3O8 output (post plant expansion) of 6.7 Mlbs (Etango-8: 3.5 Mlbs)
Expansion phase capex of US$325M (Etango-8: zero)
LOM average all-in-sustaining cash cost (AISC) of US$42.5/lb U3O8 (Etango-8:
US$38.1/lb)
Etango-XT (life extension with mine and plant throughput maintained at 8 Mtpa):
•
LOM U3O8 output of 95.2 Mlbs over 27 years (Etango-8 DFS: 52.6 Mlbs over 15 years)
•
•
•
Annual average U3O8 output of 3.5 Mlbs (Etango-8: 3.5 Mlbs)
No expansion phase capex (Etango-8: zero)
LOM average AISC of US$45.3/lb U3O8 (Etango-8: US$38.1/lb)
Key Physical Parameters: Etango-8, -XP and -XT Projects
Key Physical Parameters
Unit
Etango-8
Etango-XP
Etango-XT
Life of mine (LOM)
years
15
16
27
Long-term mine and process throughput
Mtpa
8
16
8
Total ore mined and processed
Mt
113.5
210.2
210.2
Total waste mined
Mt
253.3
670.3
670.3
Average strip ratio
x
2.2
3.2
3.2
Average uranium head grade
ppm U3O8
240
234
234
Forecast uranium recovery
%
87.8%
87.8%
87.8%
LOM uranium production
Mlbs U3O8
52.6
95.2
95.2
Average annual uranium production
Mlbs U3O8 pa
3.5
5.9 / 6.7^
3.5
Peak annual uranium production
Mlbs U3O8 pa
4.1
7.8
4.8
^ 5.9 Mlbs pa is LOM average Etango-XP output and 6.7 Mlbs pa is average Etango-XP output post expansion completion
Key Financial Outcomes: Etango-8, -XP and -XT Projects
Key Financial Metrics
Etango-8
Etango-XP
Etango-XT
Uranium price (US$/lbs U3O8)
65
65
80
95
65
80
95
Free cashflow (post-tax) (US$M)
695
939
1,804
2,669
984
1,847
2,711
Pre-tax IRR (%)
21.0
20.8
32.2
41.3
22.8
33.5
42.4
Post-tax IRR (%)
17.0
16.9
26.6
34.0
18.6
27.4
34.4
Pre-tax NPV8 from base FID (US$M)
369
445
1,017
1,590
411
862
1,314
Post-tax NPV8 from base FID (US$M)
209
250
615
974
241
526
809
Page 3 of 8
All Etango-8 cost estimates (including pre-production capex of approx. US$320M) remained materially
unchanged for the purposes of the Etango-XP/XT Scoping Study. The increased opex estimates
associated with Etango-XP/XT are predominantly driven by the higher requisite strip ratio.
The Etango-XP/XT Scoping Study has categorically demonstrated second-phase growth optionality
under the base case Etango-8 approach to initial project development. This highlights the significant
underlying value residing in Etango’s large-scale uranium resource in terms of its substantial in-ground
leverage to, and scalability with, higher uranium price outlooks. The ability to enact either the XP or XT
plans, post-delivery of the base case Etango-8 development, affords Bannerman substantial real option
value across a range of long-term uranium price outcomes.
Future feasibility work on the Etango-XP and Etango-XT options is capable of ready fast-tracking (at
the relevant point in time) given all resource drilling, geotechnical, metallurgical, process and
environmental workstreams have already been completed as part of previous DFS-level project
evaluation.
Corporate
Key executive and Board changes
On 31 January 2024, Bannerman announced changes to its Board and key executive roles, effective
from early March 2024, in further preparation for planned development of Etango. These changes
further build senior executive capacity as the Company approaches the targeted construction and longterm operation of a world-class uranium mine at Etango.
After nearly 15 years of service, Mr Ronnie Beevor retired from his role as Non-Executive Chairman.
As Non-Executive Chairman, Ronnie was instrumental in guiding the Company through critical industry
challenges to a position of financial strength and shovel-readiness for Etango.
Mr Brandon Munro, previously Managing Director and CEO, transitioned to the role of Executive
Chairman. In his new capacity, he continues to lead the financing workstream for Etango alongside
general corporate affairs and capital/investor market interface.
Ms Alison Terry was appointed as Lead Independent Director. Alison joined the board in October 2022
and brings extensive expertise in senior resource management and corporate affairs, enriched by a
deep understanding of sustainability, ESG dynamics, legal and corporate affairs, and the complexities
of major operations.
Mr Gavin Chamberlain, formerly Bannerman’s Chief Operating Officer, assumed the role of Chief
Executive Officer. He is a deeply experienced minerals sector leader and project builder, with a
substantial and successful track record in construction, engineering and project management, most
particularly within the southern African mining industry. His professional experience includes being the
responsible Project Director for the development of the US$2 billion Husab Uranium Mine in Namibia,
now one of the world’s largest operating uranium mines.
The Bannerman Board will continue to evaluate and evolve its composition as appropriate as the
business advances towards targeted FID and the construction of the Etango mine.
Inclusion in the S&P/ASX 300
On 1 March 2024, the S&P Dow Jones Indices announced Bannerman’s inclusion in the S&P/ASX 300
Index, effective 18 March 2024.
Strong Quarter-end Cash Balance of A$31.7 million
Bannerman’s cash balance at 31 March 2024 was A$31.7 million (31 December 2023: A$35.2 million).
The Company has no debt (other than typical creditor balances) or convertible instruments.
Total exploration and development expenditure for the quarter was A$2.7 million, which included FEED
work on the Etango Project. Property Plant and Equipment in relation to External Infrastructure was
A$0.2 million.
Page 4 of 8
Management continues to maintain a focus on prudent cost control and project timeliness. For the
purpose of item 6.1 of Appendix 5B, the aggregate payments during the quarter to related parties
(totalling A$199,630) were comprised of directors’ fees and salary.
Cancellation and Issue of Securities
The Company advised during the quarter, the following securities in Bannerman were cancelled or
issued:
•
432 623 Employee Unlisted Performance Rights were vested in accordance with the terms
of the EIP.
Issued Securities
At the date of this report, the Company has 152,840,770 fully paid ordinary shares, 2,150,781 unlisted
performance rights, and 2,050,864 unlisted options on issue. The performance rights and options are
subject to various performance targets and continuous employment periods.
Uranium Market
The uranium sector saw significant volatility in the first quarter of 2024. TradeTech's Spot Price
Indicator, which began the year at US$91.00/lb U3O8, rose to US$107.00/lb in early February before
falling to US$87.00 by the end of the quarter. TradeTech's Long-Term U3O8 Price Indicator showed
consistent monthly growth during the quarter, increasing by 17% from US$68.00/lb to US$80.00/lb at
the end of March 2024. This brought the Long-Term Indicator to a 15-year high.
The fact that the long-term price has more than doubled since early 2020 supports the belief that the
long-term supply gap is widening due to rising demand. This surge in demand comes from stronger
support for the nuclear industry by governments, policymakers, and the public, who recognise its vital
role in combating climate change. This support was even more evident this quarter.
At the inaugural IAEA’s Nuclear Energy Summit held in Brussels in March, leaders and representatives
from 32 countries emphasised the importance of nuclear power for energy security, climate goals, and
sustainable development. Key points included the need for increased financing, workforce
development, and support for countries new to nuclear energy. A joint statement committed to
unlocking nuclear energy's potential, extending the lifespan of existing reactors, constructing new
plants, and deploying advanced reactors while ensuring safety and security.
Another significant piece of news from this quarter is the US Department of Energy's decision to
approve loans of up to US$1.52 billion to Holtec International. This funding is intended for the reopening
of the Palisades Nuclear Power Plant in Michigan, which was decommissioned in May 2022. If
successful, this will mark a paradigm shift, as it would be the first time a nuclear plant has been returned
to operation after starting the decommissioning process and will serve as a model for numerous similar
reactors around the world.
During its 15 March 2024 earnings call, NAC Kazatomprom, the world's largest uranium producer,
reiterated its 2024 production forecast of 21,000-22,500 tU (54.6-58.5 Mlbs U3O8), roughly 20% below
the levels agreed in the Subsoil Use Agreements and consistent with 2023 outputs. The company also
confirmed it will not meet its initial target of 31,000 tU this year, highlighting a significant shortfall in
primary uranium supply (i.e. from mining) compared to global reactor demands.
In summary, the uranium market remains strong, characterised by an increase in demand due to
increasing global commitments to nuclear energy expansion. This demand compares to a tight shortterm supply and ongoing concerns over medium and long-term supply response. Additionally, the
market continues to attract interest from financial buyers. These factors collectively suggest an ongoing
positive market outlook for uranium in 2024.
Page 5 of 8
This ASX release was authorised on behalf of the Bannerman Board by:
Brandon Munro, Executive Chairman
26 April 2024
Contact
Investors:
Media:
Brandon Munro
Executive Chairman
T: +61 9831 1436
info@bmnenergy.com
Michael Vaughan
Fivemark Partners
T: +61 422 602 720
michael.vaughan@fivemark.com.au
Important Notices
This announcement contains forward-looking statements which are identified by words such as ‘may’, ‘could’, ‘believes’, ‘estimates’,
‘targets’, ‘expects’, or ‘intends’ and other similar words that involve risks and uncertainties. These statements are based on an
assessment of present economic and operating conditions, and on a number of assumptions regarding future events and actions that,
as at the date of this announcement, are considered reasonable. Such forward-looking statements are not a guarantee of future
performance and involve known and unknown risks, uncertainties, assumptions, and other important factors, many of which are beyond
the control of the Company, the Directors, and the management. The Directors cannot and do not give any assurance that the results,
performance, or achievements expressed or implied by the forward-looking statements contained in this announcement will actually
occur and investors are cautioned not to place undue reliance on these forward-looking statements. The Directors have no intention
to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new
information, future events or any other factors affect the information contained in this announcement, except where required by law or
the ASX listing rules. The information contained in this announcement does not constitute investment or financial product advice (nor
taxation, accounting, or legal advice), is not a recommendation to acquire Bannerman shares and is not intended to be used or relied
upon as the basis for making an investment decision. This announcement has been prepared without taking into account the investment
objectives, financial situation or needs of any individuals. Before making any investment decisions, prospective investors should
consider the appropriateness of the information having regard to their own investment objectives, financial situation and needs and
should seek legal, accounting and taxation advice appropriate to their jurisdiction. Bannerman is not licensed to provide investment or
financial product advice in respect of Bannerman shares.
Page 6 of 8
ABOUT BANNERMAN ENERGY (ASX:BMN, NSX:BMN, OTCQX:BNNLF)
Bannerman Energy Ltd is a uranium development business listed on the Australian and Namibian stock
exchanges and traded on the OTCQX Market in the US. Its flagship asset is the advanced Etango Uranium
Project located in the Erongo Region of Namibia.
Etango has benefited from extensive exploration and feasibility activity over the past 15 years. The Etango
tenement possesses a globally large-scale uranium mineral resource1. In December 2022, a Definitive
Feasibility Study (DFS)2 was completed on the Etango-8 Project, confirming to a definitive-level the strong
technical and economic viability of conventional open pit mining and heap leach processing of the Etango
deposit at 8Mtpa throughput (for average annual output of 3.5 Mlbs U3O8). Bannerman previously completed
advanced studies on an alternative, larger development pathway – a 20Mtpa development at Etango.
Etango’s advanced credentials are further highlighted by the construction and multi-year operation of the
Etango Heap Leach Demonstration Plant, which comprehensively de-risked the conventional acid heap
leach process to be utilised on the Etango ore. All environmental approvals have been received for the
proposed Etango mine and external mine infrastructure, based on a 12-year environmental baseline.
Bannerman was awarded the Mining Licence for Etango in December 2023 and is progressing all key project
workstreams towards a targeted positive Final Investment Decision (FID) in parallel with strengthening
uranium market fundamentals.
Namibia is a premier uranium investment jurisdiction, with a 45-year history of uranium production and
export, excellent infrastructure and support for uranium mining from both government and community. As
the world’s third largest producer of uranium, Namibia is an ideal development jurisdiction boasting political
stability, security, a strong rule of law and an assertive development agenda. The Bannerman team has
ample direct experience in the development, construction and operation of uranium projects in Namibia, as
well as extensive links into the downstream nuclear power industry.
Bannerman has long established itself as an Environmental, Social and Governance (ESG) leader in the
uranium and nuclear energy sector. It is also a leader within Namibia on social development and community
engagement and exercises best-practice governance in all aspects of its business. This was recently
recognised with receipt of the 2023 African Mining Indaba’s ESG Award for Community Engagement.
1 and 2. Refer to Bannerman’s ASX release dated 6 December 2022, Etango-8 Definitive Feasibility Study. Bannerman confirms that it is not aware of
any new information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinning
the estimates in that ASX release continue to apply and have not materially changed.
Page 7 of 8
Forward Looking Statements
The information in this announcement is not intended to guide any investment decisions in Bannerman
Energy Ltd. This material contains certain forecasts and forward-looking information, including possible
or assumed future performance, costs, production levels or rates, reserves and resources, prices and
valuations and industry growth and other trends. Such forecasts and information are not a guarantee
of future performance and involve many risks and uncertainties, as well as other factors. Actual results
and developments may differ materially from those implied or expressed by these statements and are
dependent on a variety of factors. The Company believes that it has a reasonable basis for making the
forward-looking statements in the announcement, based on the information contained in this and
previous ASX announcements.
Bannerman is not aware of any new information or data that materially affects the information included
in this ASX release, and Bannerman confirms that, to the best of its knowledge, all material
assumptions and technical parameters underpinning the estimates in this release continue to apply
and have not materially changed.
Competent Person’s Statement
The information in this announcement as it relates to Exploration Results is based on, and fairly
represents, information and supporting documentation prepared by Mr Marthinus Prinsloo. Mr Prinsloo
is a full-time employee of Bannerman Energy Ltd and is a Member of the Australasian Institute of
Mining and Metallurgy (AusIMM). Mr Prinsloo has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration, and to the activities, which he is undertaking.
This qualifies Mr Prinsloo as a “Competent Person” as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ and a Qualified
Person as defined by Canadian National Instrument 43-101. Mr Prinsloo consents to the inclusion in
this announcement in the form and context in which it appears. Mr Prinsloo holds shares and
performance rights in Bannerman Energy Ltd.
Listing Rule 5.3.3 Tenement Schedule:
BANNERMAN ENERGY LTD CONSOLIDATED BASIS
SCHEDULE OF INTERESTS IN MINING TENEMENTS
Project
Mining tenements
held
Location of
tenements
Beneficial %
interest at end of
the quarter
Change in the
quarter
Etango
Mining Licence
(ML) 250
Namibia
95%
-
Page 8 of 8