December 2015 Quarterly Activities Report
Released
Released
Announcement PDF
QUARTERLY ACTIVITIES REPORT
For the Period Ended 31 December 2015
Bannerman Resources Limited (ASX:BMN | TSX:BAN | NSX:BMN) achieved numerous milestones during
the December quarter and thereby significantly enhanced its early mover advantage in a rising uranium
price environment.
HIGHLIGHTS
Optimisation Study significantly reduced the Etango operating and capital costs and
increased the first 5 full production years profile.
Eliminated the A$12 million convertible note debt.
Raised A$4 million new funding.
Achieved 100% Etango project ownership through acquiring 20% vendor interest.
Results from Phase 2 of the Heap Leach Demonstration Plant Program further highlights
the robustness of the Etango DFS and Optimisation Study.
On 11 November 2015 Bannerman announced it had completed an Optimisation Study (“OS”) on the
geological modelling and mine planning aspects of the Etango Definitive Feasibility Study (“DFS”). Key
outcomes of the OS (at a life-of-mine price of US$75/lb U3O8):
Project net present value (NPV8%) of US$419M (previously US$69M).
Post-tax internal rate of return (“IRR”) of 15% (previously 9%).
Average annual production of 7.2Mlbs U3O8 over an initial 15.7 year open pit mine life;
o
9.2Mlbs U3O8 per annum over the first five full production years (previously 7.9Mlbs).
Average life-of-mine cash operating costs of US$38/lb U3O8 (reduced 17%);
o
US$33/lb U3O8 over the first five full production years (reduced 20%).
Pre-production capital of US$793M including mining fleet (reduced 9%).
Rapid payback from first production (4.4 years) and initial mine life to payback ratio of 3.6 times.
Total operating cash flow of US$3.7B before capital and tax, and free cash flow of US$1.6B after
capital and tax. From production commencement, average annual operating cash flow of US$236M
and free cash flow of US$150M. Peak annual free cash flow of US$392M.
Potential upside from heap leach demonstration plant results and other identified opportunities still
to be incorporated via additional optimisation work.
On 31 December 2015, the Company announced that it completed significant transactions with the
Company’s major shareholders, Resource Capital Fund IV L.P. and Resource Capital Fund VI L.P. (“RCF IV”
and “RCF VI” respectively and “RCF” collectively), and with Mr Clive Jones, a director and shareholder of
the Company, that deliver significant project ownership and balance sheet restructure.
The completed transactions entailed:
Acquisition of the minority interest (20%) in the Etango Project from the current owners
(represented by Mr Clive Jones) for payment of approximately 123.4 million new Bannerman shares
www.bannermanresources.com
BANNERMAN RESOURCES LIMITED ABN 34 113 017 128
Corporate Office Unit 1 ■ 2 Centro Avenue ■ Subiaco Western Australia 6008
Post PO Box 1973 ■ Subiaco Western Australia 6904 T +61 8 9381 1436 F +61 8 9381 1068
and A$1 million in cash;
Extinguishment of the A$12 million convertible notes through:
o
conversion of A$8 million of the convertible notes held by RCF into Bannerman shares at the
given conversion price of A$0.075 per share;
o
sale of a 1.5% royalty over the Etango Project to RCF for A$6 million, comprising A$2 million in
cash and extinguishment of the residual convertible notes held by RCF (comprising A$4
million); and
A$3 million capital raising through an equity placement of approximately 63.3 million new
Bannerman shares to RCF VI at A$0.0474 per share.
Bannerman’s Chief Executive Officer, Len Jubber, said:
“In the December quarter Bannerman made significant progress in advancing the bankability of the
Etango project and creating a corporate structure to facilitate financing the project.
The culmination of an extensive review of the geology and mining aspects of the project in significantly
lower operating and capital costs, together with increased production in the early years has resulted in
materially repositioning the Etango project in the global cost curve of projects targeting development in a
near term rising uranium price.
Further, the creation of a debt free well-funded company, owning 100% of a globally significant project
capable of development in a near term rising uranium price creates a strong platform from which to
engage with parties interested in participating in the development of the Etango project.”
Len Jubber
Chief Executive Officer
28 January 2016
For further information please contact:
Len Jubber
Chief Executive Officer
Perth, Western Australia
Tel: +61 (8) 9381 1436
admin@bannermanresources.com.au
Robert Dalton
Financial Controller & Company Secretary
Perth, Western Australia
Tel: +61 (8) 9381 1436
admin@bannermanresources.com.au
Spyros Karellas
Investor Relations
Toronto, Ontario, Canada
Tel: +1 416 433 5696
spyros@pinnaclecapitalmarkets.ca
About Bannerman - Bannerman Resources Limited is an ASX, TSX and NSX listed exploration and development company with
uranium interests in Namibia, a southern African country which is a premier uranium mining jurisdiction. Bannerman’s principal
asset is its 100%-owned Etango Project situated near Rio Tinto’s Rössing uranium mine, Paladin’s Langer Heinrich uranium mine
and CGNPC’s Husab uranium mine currently under construction. A definitive feasibility study and an optimisation study has
confirmed the technical, environmental and financial (at consensus long term uranium prices) viability of a large open pit and
heap leach operation at one of the world’s largest undeveloped uranium deposits. In 2016, Bannerman is continuing a large scale
heap leach demonstration program to provide further assurance to financing parties, generate process information for the
detailed engineering design phase and build and enhance internal capability. More information is available on Bannerman’s
website at www.bannermanresources.com.
Page 2 of 7
ETANGO PROJECT (Bannerman 100%)
DFS (completed in 2012)
Bannerman completed the DFS and Environmental and Social Impact Assessment (“ESIA”) on the Etango project in
2012. The respective studies, as announced to the market on 10 April 2012, confirmed the technical, economic and
environmental viability of the project at historical term uranium prices.
DFS Optimisation Study (“OS”) (completed in 2015)
The OS focused on the geology and mine planning aspects of the DFS and updated the Capital and Operating cost
estimates to 2015 financial terms. The study was announced to the market on the 11 November 2015 and strongly
enhanced the financial viability of the Etango project. The key outcomes of the study are compared with the DFS in
the table below:
Units
DFS
Optimisation
Study
Definitive
Feasibility
Study
% Change
US$/lb U3O8
75
75
-
Mine Life
Years
15.7
15.0
4%
Total Mined Ore
Mt
303
280
8%
Life-of-mine stripping ratio
Waste : Ore
2.78 : 1
3.34 : 1
-17%
Annual Processing Throughput
Mt of ore
20
20
-
Processed grade
ppm U3O8
195
194
-
Processed grade (First 5 years of full production)
ppm U3O8
241
207
+16%
%
86.9
86.9
-
Ave. Annual Production for first 5 full production years
Mlbs U3O8 pa
9.18
7.92
+16%
Average Annual Production (U3O8)
Mlbs U3O8 pa
7.20
6.90
+4%
Life-of-mine Production (U3O8)
Mlbs U3O8
113
104
+9%
Pre-production Capital Expenditure
US$ million
793
870
-9%
Sustaining Capital Expenditure
US$ million
282
381
-26%
Average Cash Operating Cost for first 5 years
US$/lb U3O8
33
41
-20%
Average Cash Operating Cost for life-of-mine
US$/lb U3O8
38
46
-17%
Net Present value (8%)
US$ million
419
69
+511%
Internal Rate of Return (at Base Case price)
%pa, post-tax
15%
9%
+66%
Net cash flow breakeven uranium price
US$/lb U3O8
52
61
-15%
Years
4.4
6.0
-27%
Item
Base Case Uranium Price
Processing recovery
Payback (from first production)
Mineral Resource Estimates
The Mineral Resource Estimate was updated to include a 3,419m of additional drilling not incorporated in the DFS
models.
Uranium mineralization has been defined inside grade envelopes by categorical indicator kriging using a lower cut-off
grade of 50 ppm U3O8 and lithological constraints.
In addition, the update considered the relevant operational aspects associated with open pit uranium mining, most
notably the established practice of radiometric haul truck scanning as a means of discriminating between ore and
waste material at the haul truck payload level. Uniform Conditioning (UC) was employed to model the selectivity
associated with this mining method.
Page 3 of 7
The updated Mineral Resource (which includes Ore Reserves) formed the basis of the optimization study and is
tabulated below:
Mineral Resource
Nov 2015
Deposit
Measured
Cut Off
Tonnes
Grade
Grade
(Mt)
Indicated
In-situ
Tonnes
Grade
(U3O8
U3O8
(Mt)
(U3O8
U3O8
ppm)
(Mlbs)
ppm)
(Mlbs)
188
150.2
144.5
196
62.5
100
85.1
166
31.3
100
33.6
166
12.3
263.2
182
106.1
(U3O8
In-situ
Tonnes
Grade
(U3O8
U3O8
(Mt)
ppm)
(Mlbs)
194
14.4
Inferred
In-situ
ppm)
Etango1
55
Ondjamba
2
Hyena3
Total
33.7
33.7
194
14.4
362
362
188
150.2
Note 1: Refer to the Competent Persons Statement at the end of this document for further information on the Etango Mineral Resource Estimate.
The Etango estimate has been reported in accordance with JORC 2012. The figures may not add due to rounding.
Note 2 & 3: Refer to the Competent Persons Statement at the end of this document for further information on the Ondjamba and Hyena Mineral
Resource Estimates. The Ondjamba and Hyena estimates remain unchanged from the previous declaration and therefore have been reported in
accordance with JORC 2004. The figures may not add due to rounding.
Ore Reserve Estimates
As part of the OS, Bannerman updated the Ore Reserve Estimate which incorporated the following changes from the
DFS:
Updating the Mineral Resource model (as detailed above),
Updating the operating cost estimates,
Updating the capital cost estimates, and
Updated mining studies including revised open pit designs (including geotechnical review) and mine
schedules.
The updated Ore Reserve Estimate is tabulated below.
Ore Reserve
Nov 2015
Deposit
Proved
Probable
Total
Cut Off
Tonnes
Grade
In-situ
Tonnes
Grade
In-situ
Tonnes
Grade
Grade
(Mt)
(U3O8
U3O8
(Mt)
(U3O8
U3O8
(Mt)
(U3O8
U3O8
ppm)
(Mlbs)
ppm)
(Mlbs)
ppm)
(Mlbs)
196
14
194
116.1
195
130.1
(U3O8
In-situ
ppm)
Etango
55
32.3
271
303.3
Regulatory Approvals
Bannerman received Environmental Clearance in July 2012 for its plans to establish the Etango Project as a 20Mtpa
heap leach operation as described in the DFS. The Environmental Clearance was valid for 3 years and expired in July
2015 upon which renewal of the Environmental Clearance was requested. The updated Environmental Clearance
was granted on 11 November 2015, valid for 3 years.
Heap Leach Demonstration Plant Program
The 18 – 24 month heap leach demonstration plant program, which commenced in April 2015, is a key component of
the project’s detailed engineering and financing phases. It is specifically aimed at demonstrating the design and
projected performance reflected in the DFS, further enhancing the project knowledge and pursuing value
engineering.
Page 4 of 7
On 23 November 2015, Bannerman reported on the objectives and various phases of the Heap Leach Demonstration
Plant Program, and the key observations, results and preliminary conclusions from Phase 2:
1.
2.
3.
Demonstrating the design and projected performance reflected in the DFS
o
Fast and high average leach extraction of 93% for the two cribs (compared to the DFS projection for
a scaled up heap of 86.9%) and 91% for the four columns within 20 days. Average sulphuric acid
consumption was 15kg/tonne (compared to the DFS projection of 17.6kg/tonne).
o
Visual observations during the unloading of the cribs again confirmed uniform percolation through
the material and integrity of the agglomerate.
o
Testing continues to confirm the simple chemistry and efficient leaching nature of the granite host
rock and uranium mineralisation.
Further enhancing project knowledge
o
Improved the safe handling of the sulphuric acid by way of further reducing manual handling.
o
Platform scales installed under all of the pregnant liquor solution tanks to further enhance the
metallurgical accounting and hence process control ability.
o
The metallurgical database continues to grow dramatically with the further testing of 60 tonnes of
ore in the two cribs and 0.8 tonnes of material in the 4 column tests. The total sample tested in
Phase 1 and Phase 2 now amounts to approximately 182 tonnes.
Pursuing value engineering
o
Rapid and uniform percolation, coupled with rapid and high leach extraction at a larger scale point
towards the potential to further optimise the heap leach configuration.
o
Surprisingly no noticeable reduction in leach extraction performance was observed between the
larger scale cribs and the smaller columns. This poses the question as to the appropriate scale up
factors to be used in the detailed engineering of the heap leach operation. Further work is required
to address this matter.
Phase 3 which aims to simulate the full scale heap operation by way of closed circuit operation of three cribs was
commenced in September and completed during December 2015; the results are currently being reviewed.
URANIUM MARKET
In December 195 nations reached agreement on a new climate change policy at the United Nations Climate Change
Conference held in Paris. This agreement heralds a renewed global focus on reducing greenhouse gas emissions and
a move away from fossil fuels. Nuclear energy remains the only credible alternate base load energy source to satisfy
the need secure and clean energy.
The nuclear power development program in China proceeded largely to plan in 2015, with 8 new reactors
commissioned during past year. China had 30 reactors in operation by end 2015 with another 24 units under
construction, 40 on order or planned and 136 proposed. China is planning to double its current nuclear capacity by
2020 and yet again thereafter by 2030.
In Japan, Sendai reactors #1 & 2 are now fully operational whilst refuelling has begun at Kansai’s Takahama #3 & #4
reactors. A further 5 reactors were approved by the Nuclear Regulation Authority for restart and applications have
been submitted for another 25.
Page 5 of 7
India’s six reactor deal with Russia was recently expanded to 12 reactors. India now has 21 operable reactors, six
under construction, 24 on order or planned and 36 proposed.
Globally, according to the World Nuclear Association, there are currently 439 operable nuclear reactors and 66 under
construction, 158 on order or planned and 330 proposed.
CORPORATE
Project Financing
The results from Phase 1 and 2 of the demonstration plant program strongly support the heap leach assumptions and
projections incorporated in the DFS, and are expected, therefore, to enhance the bankability of the project. The
program scheduled for the coming quarters will focus on similarly demonstrating the solvent extraction component
of the flow sheet as well as on value engineering opportunities identified to date.
On 31 December 2015, the Company completed the transaction to eliminate the A$12 million debt, acquire 100%
ownership of the Etango Project and a capital raising, to enhance the ability to attract further cornerstone investors
and development partners.
Cash Position and Operating Expenditure
Bannerman’s cash reserves as at 31 December 2015 totalled A$4.16 million (30 September 2015: A$1.0 million). Net
operating cash outflow during the quarter totalled A$0.864 million. The transactions, referred to on page 1, resulted
in net A$4 million of new funding.
Issued Securities
At the date of this report, Bannerman has 701,934,188 ordinary shares on issue.
During the quarter, Bannerman issued 385,766,645 ordinary shares to eliminate the two convertible notes and
acquire the remaining 20% interest in the Etango project as described on page 1.
At 31 December 2015, Bannerman had on issue 42,497,924 performance and share rights and 16,014,400 unlisted
share options. The share rights and share options are subject to various performance targets and continuous
employment periods.
Annual and Extraordinary General Meetings
The Annual General Meeting and an Extraordinary General Meeting were respectively held on 11 November 2015
and 29 December 2015, with all resolutions carried on the show of hands.
Schedule of Mining Tenements
The Bannerman Group currently holds Exclusive Prospecting Licence 3345 (“EPL3345”) in Namibia. An application to
renew EPL3345, which expired on 26 April 2015, was lodged on 26 January 2015 and is expected to be approved in
due course.
The delayed renewal is not deemed to be an issue as Regulation 71 (3) (a) from the Minerals (Prospecting and
Mining) Act (Act 33 of 1992), which states “an exclusive prospecting license shall not expire during a period during
which an application for the renewal of such license is being considered, until such application is refused or the
application is withdrawn or has lapsed, whichever occurs first……”, still applies.
Except for the acquisition of the remaining 20% interest in Bannerman Mining Resources (Namibia) (Pty) Ltd (as
referred to on page 1), there were no interests in other mining tenements or any beneficial interests in farm-in or
farm-out agreements which were acquired or disposed of during the quarter.
TECHNICAL DISCLOSURES
Certain disclosures in this report, including management's assessment of Bannerman’s plans and projects, constitute
forward looking statements that are subject to numerous risks, uncertainties and other factors relating to
Bannerman’s operation as a mineral development company that may cause future results to differ materially from
those expressed or implied in such forward-looking statements. Full descriptions of these risks can be found in
Bannerman’s various statutory reports, including its Annual Information Form available on the SEDAR website,
sedar.com. Readers are cautioned not to place undue reliance on forward-looking statements. Bannerman expressly
Page 6 of 7
disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new
information, future events or otherwise.
Mineral Resources include Ore Reserves (Mineral Reserves)
Mineral Resources which are not Ore Reserves (Mineral Reserves) do not have demonstrated economic viability.
The information in this report relating to the Mineral Resources of the Etango Project is based on information by Mr
Ian Glacken. Mr Glacken is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Glacken is a full-time
employee of Optiro Pty Ltd. Mr Glacken has sufficient experience relevant to the style of mineralisation and types of
deposits under consideration and to the activity which is being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves”, and a Qualified Person as defined by Canadian National Instrument 43-101. Mr Glacken consents to
the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this report relating to the Ore Reserves of the Etango Project is based on information by Mr Leon
Fouché. Mr Fouché is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Fouché is a full-time
employee of the Company. Mr Fouché has sufficient experience relevant to the style of mineralisation and types of
deposits under consideration and to the activity which is being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves”, and a Qualified Person as defined by Canadian National Instrument 43-101. Mr Fouché consents to
the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this report pertaining to Mineral Resources and Ore Reserves for the Etango deposit is extracted
from the report entitled “Etango Uranium Project Optimisation Study November 2015” and is available to view on
www.bannermanresources.com.au. The company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcement and, in the case of estimates of
Mineral Resources or Ore Reserves, which all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed. The company
confirms that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
All material assumptions detailed in this report and underpinning the production target and forecast financial
information in the DFS Optimisation Study (as previously announced on 11 November 2015 in compliance with
Listing Rule 5.16 and 5.17) continue to apply and have not materially changed.
Page 7 of 7