Unaudited Quarterly Financials and MD&A - September 2015
Released
Released
Announcement PDF
STOCK EXCHANGE
ANNOUNCEMENT
12 November 2015
FINANCIAL STATEMENTS AND MANAGEMENT’S DISCUSSION AND ANALYSIS FOR
THE PERIOD ENDED 30 SEPTEMBER 2015
Bannerman Resources Limited (ASX: BMN, TSX: BAN, NSX: BMN) attaches its consolidated Financial
Statements and Management’s Discussion and Analysis for the period ended 30 September 2015.
The above documents are also filed with the relevant regulatory authorities in Canada.
For further information please contact:
Len Jubber
Chief Executive Officer
Perth, Western Australia
Tel: +61 (8) 9381 1436
admin@bannermanresources.com.au
Robert Dalton
Financial Controller & Company Secretary
Perth, Western Australia
Tel: +61 (8) 9381 1436
admin@bannermanresources.com.au
Spyros Karellas
Investor Relations
Toronto, Ontario, Canada
Tel: +1 416 433 5696
spyros@pinnaclecapitalmarkets.ca
About Bannerman - Bannerman Resources Limited is an ASX, TSX and NSX listed exploration and development company with
uranium interests in Namibia, a southern African country which is a premier uranium mining jurisdiction. Bannerman’s principal
asset is its 80%-owned Etango Project situated near Rio Tinto’s Rössing uranium mine, Paladin’s Langer Heinrich uranium mine
and CGNPC’s Husab uranium mine currently under construction. A definitive feasibility study and an optimisation study have
confirmed the technical, environmental and financial (at consensus long term uranium prices) viability of a large open pit and
heap leach operation at one of the world’s largest undeveloped uranium deposits. In 2015, Bannerman is conducting a large scale
heap leach demonstration program to provide further assurance to financing parties, generate process information for the
detailed engineering design phase and build and enhance internal capability. More information is available on Bannerman’s
website at www.bannermanresources.com.
www.bannermanresources.com
BANNERMAN RESOURCES LIMITED ABN 34 113 017 128
Corporate Office Unit 1 ■ 2 Centro Avenue ■ Subiaco Western Australia 6008
Post PO Box 1973 ■ Subiaco Western Australia 6904 T +61 8 9381 1436 F +61 8 9381 1068
November 12, 2015
Notice Pursuant to Part 4.3(3)(a) of National Instrument 51-102
Continuous Disclosure Obligations
The Interim Financial Statements of Bannerman Resources Limited filed for the three months period
ended September 30, 2015 have not been reviewed by its auditor, Ernst & Young, in accordance with the
standards for a review of interim financial statements as set out in the Handbook published by the
Canadian Institute of Chartered Accountants.
Date: November 12, 2015
“DAVID TUCKER”
___________________________
David Tucker
Chairman, Audit Committee
Bannerman Resources Limited
www.bannermanresources.com
BANNERMAN RESOURCES LIMITED ABN 34 113 017 128
Corporate Office Unit 1 ■ 2 Centro Avenue ■ Subiaco Western Australia 6008 Post PO Box 1973 ■ Subiaco Western Australia 6904
T +61 8 9381 1436 F +61 8 9381 1068
Page 1
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
FINANCIAL REPORT
FOR THE THREE MONTH PERIOD ENDED
30 SEPTEMBER 2015
www.bannermanresources.com
BANNERMAN RESOURCES LIMITED ABN 34 113 017 128
Corporate Office Unit 1 ■ 2 Centro Avenue ■ Subiaco Western Australia 6008 Post PO Box 1973 ■ Subiaco Western Australia 6904
T +61 8 9381 1436 F +61 8 9381 1068
Page 1
FINANCIAL REPORT
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
Unaudited Consolidated Statement of Comprehensive Income
3
Unaudited Consolidated Statement of Financial Position
4
Unaudited Consolidated Cash Flow Statement
5
Unaudited Consolidated Statement of Changes in Equity
6
Notes to the Financial Statements
7
www.bannermanresources.com
BANNERMAN RESOURCES LIMITED ABN 34 113 017 128
Corporate Office Unit 1 ■ 2 Centro Avenue ■ Subiaco Western Australia 6008 Post PO Box 1973 ■ Subiaco Western Australia 6904
T +61 8 9381 1436 F +61 8 9381 1068
Page 2
UNAUDITED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
Note
3 Months Ended
30 September
2015
2014
$'000
$'000
3 Months Ended
30 September
2015
2014
$'000
$'000
Other revenue
Other income
2
3
10
2
28
-
10
2
28
-
Employee benefits
Borrowing costs
Compliance and regulatory expenses
Depreciation expense
Other expenses
4(a)
4(b)
4(c)
(374)
(580)
(100)
(22)
(429)
(394)
(508)
(71)
(21)
(144)
(374)
(580)
(100)
(22)
(429)
(394)
(508)
(71)
(21)
(144)
5
(1,493)
145
(1,110)
500
(1,493)
145
(1,110)
500
(1,348)
(610)
(1,348)
(610)
(2,296)
748
(2,296)
748
Other comprehensive (loss)/income for the
period (net of tax)
(2,296)
748
(2,296)
748
Total comprehensive loss
(3,644)
138
(3,644)
138
Net loss is attributable to:
Equity holders of Bannerman Resources Limited
Non-controlling interest
(1,325)
(23)
(589)
(21)
(1,325)
(23)
(589)
(21)
(1,348)
(610)
(1,348)
(610)
(3,604)
(40)
154
(16)
(3,604)
(40)
154
(16)
(3,644)
138
(3,644)
138
387,389
312,435
387,389
312,435
(0.35)
(0.36)
(0.35)
(0.36)
Loss before income tax
Income tax benefit
Net loss for the period
Other comprehensive (loss)/income
Items that may be reclassified subsequently to
profit or loss
Foreign currency translation
Total comprehensive loss is attributable to:
Equity holders of Bannerman Resources Limited
Non-controlling interest
Weighted average number of shares ('000)
Basic and diluted loss per share to the ordinary
equity holders of the Company (cents per share)
13(b)
The above statement of comprehensive income should be read in conjunction with the accompanying notes.
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
3
UNAUDITED CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
Note
30 September 2015
$’000
6
7
1,014
221
51
2,291
166
82
1,286
2,539
15
822
59,593
15
872
61,262
TOTAL NON-CURRENT ASSETS
60,430
61,262
TOTAL ASSETS
61,716
64,688
697
10,591
206
693
198
11,494
891
391
10,281
399
391
10,680
TOTAL LIABILITES
11,885
11,571
NET ASSETS
49,831
53,117
119,707
33,430
(102,239)
119,468
35,590
(100,914)
TOTAL PARENT ENTITY INTEREST
50,898
54,144
Non-controlling interest
(1,067)
(1,027)
TOTAL EQUITY
49,831
53,117
CURRENT ASSETS
Cash and cash equivalents
Other receivables
Other
TOTAL CURRENT ASSETS
NON-CURRENT ASSETS
Other receivables
Property, plant and equipment
Exploration and evaluation expenditure
CURRENT LIABILITIES
Trade and other payables
Interest bearing liabilities
Provisions
7
8
9
10
TOTAL CURRENT LIABILITIES
NON CURRENT LIABILITIES
Interest bearing liabilities
Provisions
10
11
TOTAL NON CURRENT LIABILITIES
EQUITY
Contributed equity
Reserves
Accumulated losses
12
13
30 June 2015
$’000
The above statement of financial position should be read in conjunction with the accompanying notes.
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
4
UNAUDITED CONSOLIDATED CASH FLOW STATEMENT
FOR THE PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
Note
3 Months Ended
30 September
2015
2014
$’000
$’000
3 Months Ended
30 September
2015
2014
$’000
$’000
CASHFLOWS FROM OPERATING ACTIVITIES
Payments to suppliers and employees
Interest received
Other – R&D refund
(696)
11
145
(647)
26
500
(696)
11
145
(647)
26
500
Net cash utilised in operating activities
(540)
(121)
(540)
(121)
Payments for exploration and evaluation
Purchase of plant and equipment
Proceeds from disposal of plant and equipment
(738)
(2)
-
(309)
(5)
-
(738)
(2)
-
(309)
(5)
-
Net cash utilised in investing activities
(740)
(314)
(740)
(314)
Net decrease in cash and cash equivalents
(1,280)
(435)
(1,280)
(435)
Cash and cash equivalents at beginning of
period
2,291
5,112
2,291
5,112
3
-
3
-
1,014
4,677
1,014
4,677
CASHFLOWS FROM INVESTING ACTIVITIES
Effects of exchange rate changes on the balance
of cash held in foreign currencies
Cash and cash equivalents at end of period
6
The above cash flow statement should be read in conjunction with the accompanying notes.
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
5
UNAUDITED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
Issued
Accumulated
Foreign
Share Based Convertible
Capital
Losses
Currency
Reserve
Payment
Reserve
Note
Reserve
$’000
$’000
$’000
$’000
$’000
119,468
(100,914)
(22,673)
54,058
4,038
Loss for the period
-
(1,325)
-
-
Other comprehensive income
-
-
(2,279)
Total
comprehensive
(loss)/income for the period
-
(1,325)
Shares issued during the
period
239
Share-based payments
Balance at 1 July 2015
Asset
NonRevaluation controlling
Reserve
Interest
$’000
Total
$’000
$’000
167
(1,027)
53,117
-
-
(23)
(1,348)
-
-
-
(17)
(2,296)
(2,279)
-
-
-
(40)
(3,644)
-
-
-
-
-
-
239
-
-
-
119
-
-
-
119
119,707
(102,239)
(24,952)
54,177
4,038
167
(1,067)
49,831
Total Equity at
30 September 2015
Issued
Accumulated
Capital
Losses
Foreign
Currency
Reserve
$’000
$’000
$’000
$’000
116,730
(96,777)
(25,648)
53,523
4,038
167
(947)
51,086
Loss for the period
-
(589)
-
-
-
-
(21)
(610)
Other comprehensive income
-
-
743
-
-
-
5
748
Total
comprehensive
income/(loss) for the period
-
(589)
743
-
-
-
(16)
138
Shares issued during the
period
163
-
-
-
-
-
-
163
Share-based payments
-
-
-
142
-
-
-
142
116,893
(97,366)
(24,905)
53,665
4,038
167
(963)
51,529
Balance at 1 July 2014
Share Based Convertible
Asset
NonPayment
Note
Revaluation controlling
Reserve
Reserve
Reserve
Interest
$’000
$’000
$’000
Total
$’000
Total Equity at
30 September 2014
The above statement of changes in equity should be read in conjunction with the accompanying notes.
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
6
NOTES TO THE FINANCIAL STATEMENTS
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
1.
BASIS OF PREPARATION AND ACCOUNTING POLICIES
Corporate Information
Bannerman is a company incorporated in Australia and limited by shares. Bannerman’s shares are publicly traded
on the Australian Securities Exchange (“ASX”) with additional listings on the Toronto Stock Exchange and the
Namibian Stock Exchange.
Basis of Preparation
This general purpose condensed financial report for the three month period ended 30 September 2015 has been
prepared in accordance with AASB 134 Interim Financial Reporting and the Corporations Act 2001.
The financial report does not include all notes of the type normally included within the annual financial report and
therefore cannot be expected to provide as full an understanding of the financial performance, financial position
and financing and investing activities of Bannerman and its controlled entities (the “Group”) as the annual financial
report.
It is recommended that this interim financial report be read in conjunction with the annual report for the year ended
30 June 2015 and considered together with any public announcements made by Bannerman since that time in
accordance with the continuous disclosure obligations of the ASX Listing Rules.
The financial report is presented in Australian dollars and, unless otherwise stated, all values are rounded to the
nearest thousand dollars (A$1,000) in accordance with the option available to the Company under Australian
Securities and Investments Commission (ASIC) Class Order 98/0100. The Company is an entity to which the class
orders applies.
Changes in Accounting Policies
From 1 July 2015, the Group has adopted all the Standards and Interpretations mandatory for annual periods
beginning on 1 July 2015. Adoption of these Standards and Interpretations did not have any effect on the financial
position or performance of the Group.
The Group has not elected to early adopt any new Standards or Interpretations. The accounting policies adopted in
the preparation of the consolidated financial statements are consistent with those followed in the preparation of the
Group’s annual consolidated financial statements for the year ended 30 June 2015.
Going Concern
The Group’s consolidated financial statements have been prepared on a going concern basis which contemplates the
continuity of normal business activities and the realisation of assets and the settlement of liabilities in the ordinary
course of business. The Group’s cash flow forecast reflects that additional working capital will need to be raised
within the current financial year in addition to RCF having granted a waiver of the minimum cash covenant under the
RCF IV and RCF VI convertible note facilities to enable the Group to continue its planned business activities and
expenditure levels.
On 11 November 2015, the Company announced the signing of agreements with Resource Capital Fund IV L.P.,
Resource Capital Fund VI L.P. and Mr Clive Jones to effect a Corporate Restructure, if approved by shareholders, on
the terms below:
an equity placement of approximately 63.3 million new Bannerman shares to RCF at A$0.0474 per share to raise
A$3 million in cash.
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
7
NOTES TO THE FINANCIAL STATEMENTS
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
conversion of A$8 million of the convertible notes held by RCF into Bannerman shares at the given conversion
price of A$0.075 per share; grant of a 1.5% royalty over the Etango Project to RCF for A$6 million, comprising
A$2 million in cash and extinguishment of the residual convertible notes held by RCF (A$4 million); and
acquisition of the minority interest (20%) in the Etango Project from the current owners (represented by Mr
Clive Jones) for payment of approximately 123.4 million new Bannerman shares and A$1 million in cash;
At the date of this financial report, the directors are satisfied there are reasonable grounds to believe that, having
regard to the Group’s position and its available financing options, the Group will be able to raise further capital to
enable it to meet its obligations as and when they fall due.
Should the Group not achieve the matters set out above, there would be uncertainty whether the Group would
continue as a going concern and therefore whether it would realise its assets and extinguish its liabilities in the
normal course of business and at the amounts stated in this financial report. This financial report does not include
any adjustment relating to the recoverability or classification of recorded asset amounts or to the amounts or
classification of liabilities that might be necessary should the Group not be able to continue as a going concern.
3 Months Ended
30 September
2015
2014
$’000
$’000
2.
OTHER REVENUE
Interest income
3.
3 Months Ended
30 September
2015
2014
$’000
$’000
10
28
10
28
2
2
-
2
2
-
OTHER INCOME
Profit on disposal of plant and equipment
Other
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
8
NOTES TO THE FINANCIAL STATEMENTS
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
3 Months Ended
30 September
2015
2014
$’000
$’000
4.
EXPENSES
(a)
Employee benefits
Salaries and wages
Superannuation
Employee share-based payment expense
Other
Directors’ fees
Directors’ share-based payment expense
(b)
182
14
108
4
53
33
394
188
12
84
3
53
34
374
182
14
108
4
53
33
394
580
580
508
508
580
580
508
508
64
246
50
22
8
26
13
429
45
25
1
20
12
25
12
4
144
64
246
50
22
8
26
13
429
45
21
20
12
25
12
4
144
145
-
500
-
145
-
500
-
Other expenses
Corporate and overheads
Consulting - fees
Consulting - share based payment expense
Legal
Travel
Employer related taxes
Occupancy
Insurance
Loss on disposal of plant and equipment
5.
188
12
84
3
53
34
374
Borrowing costs
Interest accreted or payable
(c)
3 Months Ended
30 September
2015
2014
$’000
$’000
INCOME TAX
Current income tax benefit
Current income tax benefit comprises the receipt of research and development incentive refunds from government authorities.
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
9
NOTES TO THE FINANCIAL STATEMENTS
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
6.
CASH & CASH EQUIVALENTS
30 September 2015
$’000
3
164
847
1,014
Cash on hand
Cash at bank and on call (interest bearing)
Short term cash deposits (interest bearing)
30 June 2015
$’000
3
1,441
847
2,291
Under the terms of the existing Convertible Notes (Note 10), the Company must, unless otherwise approved, maintain a
minimum cash and cash equivalents balance of not less than A$1,250,000. The requirement was waived on 1 September 2015.
7.
OTHER RECEIVABLES
Current
GST/VAT receivable
Other receivables
Non Current
Restricted cash
221
221
165
1
166
15
15
15
15
Restricted cash reflects collateral for a third party bank guarantee for the occupancy of office premises.
8.
PROPERTY, PLANT & EQUIPMENT
Cost
Accumulated
Depreciation
$’000
$’000
Net Book
Value
$’000
30 September 2015
Land and buildings
Vehicles
Plant and equipment
Office furniture and equipment
643
206
133
842
1,824
(10)
(167)
(115)
(710)
(1,002)
633
39
18
132
822
669
215
136
853
1,873
(9)
(168)
(116)
(708)
(1,001)
660
47
20
145
872
30 June 2015
Land and buildings
Vehicles
Plant and equipment
Office furniture and equipment
9.
EXPLORATION & EVALUATION EXPENDITURE
Three months ended
30 September 2015
$’000
Opening balance
Expenditure incurred during the period
Foreign currency translation movements
61,262
599
(2,268)
59,593
Year ended
30 June 2015
$’000
54,899
3,289
3,074
61,262
Expenditure incurred during the period comprised expenditure on geological, feasibility and associated activities.
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
10
NOTES TO THE FINANCIAL STATEMENTS
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
The value of the Company’s interest in exploration and evaluation expenditure is dependent upon:
the continuance of the Company’s rights to tenure of the areas of interest;
the results of pre-development activities; and
the recoupment of costs through successful development and exploitation of the areas of interest, or
alternatively, by their sale.
Etango Uranium Project – Bannerman 80%
The Etango Uranium Project is situated near Rio Tinto’s Rössing uranium mine, Paladin’s Langer Heinrich uranium
mine and CGNPC’s Husab uranium mine currently under construction. Bannerman, in 2012, completed a Definitive
Feasibility Study (“DFS”) on a 7-9 million pounds U3O8 per annum open pit mining and heap leach processing
operation at Etango. The DFS confirmed the technical, environmental and financial (at consensus long term uranium
prices) viability of a large open pit and heap leach operation at one of the world’s largest undeveloped uranium
deposits. In 2015, Bannerman commenced a large scale heap leach demonstration program to provide further
assurance to financing parties, generate process information for the detailed engineering design phase and build
and enhance internal capability.
On 11 November 2015, the Company announced the results of the DFS Optimisation Study (“OS”). The OS focussed
primarily on the geology and mining aspects of the project and incorporated an updated Mineral Resource model
that simulates the selectivity associated with the established process of radiometric truck scanning in uranium
mining. A relatively minor amount of additional drilling was also included in the model. Capital costs and operating
costs were updated to ensure that these estimates remained current and reflect the prevailing economic climate.
The mine plan was updated to incorporate the aforementioned changes and included updated pit optimisations, pit
designs, geotechnical review and mine production schedules employing variable cut-off grade policies.
Financial analysis of the revised mine production schedules demonstrate drastically improved economics with an
NPV8 of US$419 million and corresponding IRR of 15%.
In addition, on 11 November 2015, the Company announced the signing of an agreement with Mr Clive Jones,
subject to shareholders approval, to acquire the minority interest (20%) in the Etango Project from the current
owners (represented by Mr Clive Jones) for payment of approximately 123.4 million new Bannerman shares and A$1
million in cash. Therefore, if approved at the forthcoming Extraordinary General Meeting by shareholders, the
Company would have 100% ownership of the Etango Uranium Project.
The Etango Project comprises one Exclusive Prospecting Licence (“EPL”) 3345 in Namibia. An application to renew
the EPL, which expired on 26 April 2015, was lodged on 26 January 2015 and is expected to be renewed in due
course.
The delayed renewal is not deemed to be an issue as Regulation 71 (3) (a) from the Minerals (Prospecting and
Mining) Act (Act 33 of 1992) states “an exclusive prospecting licence shall not expire during a period during which an
application for the renewal of such licence is being considered, until such application is refused or the application is
withdrawn or has lapsed, whichever occurs first……” still applies. Bannerman permitted, constructed and
commissioned the Heap Leach Demonstration Plant during the recently expired licence period. These activities and
associated expenditure were in accordance with the agreed terms and conditions associated with the licence. The
company has met all its reporting obligations and no known breaches of any regulations were incurred. Therefore,
the Directors are satisfied that the requirements with regard to tenure have been met.
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
11
NOTES TO THE FINANCIAL STATEMENTS
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
Exploration & Evaluation Expenditure for the Etango Project
Three months ended
30 September 2015
$’000
Opening balance
Drilling and consumables
Assays and freight
Salaries and wages
Consultants and contractors
Demonstration plant construction cost
Demonstration plant change in rehabilitation provision
Demonstration plant operational cost
Travel and accommodation
Other
Total expenditure for the period
Foreign currency translation movements
Exploration expenditure written off
Closing balance
Year ended
30 June 2015
$’000
61,262
1
192
198
27
8
137
3
33
599
(2,268)
59,593
54,899
4
675
181
1631
399
317
15
67
3,289
3,074
61,262
30 September 2015
$’000
30 June 2015
$’000
10. INTEREST BEARING LIABILITIES
Current liabilities
Secured convertible note
10,591
-
Non Current liabilities
Secured convertible note
-
10,281
Resource Capital Fund IV L.P. (“RCFIV”) convertible note
In November 2008, Bannerman entered into a financing agreement with RCFIV for A$20 million through a convertible note facility
comprising an initial tranche of A$10 million (“First Tranche”) and a standby tranche of A$10 million available within 6 months
from drawdown of the First Tranche. The First Tranche had a three year term and was drawn down on 16 December 2008.
On 14 December 2011, the face value of the note with RCFIV was reduced to A$8 million through the issue of A$2 million in new
Bannerman shares as part of an institutional share placement, and a longer term refinancing and extension of the note from its
maturity date of 31 March 2012 to 31 March 2014. The issue of shares and the reduction in the face value of the note was a noncash transaction.
On 6 September 2013, the Group reached agreement with RCFIV for the extension and refinancing of the note from its maturity
date of 31 March 2014 to 30 September 2016. The key terms of the amended RCFIV note are a conversion price of A$0.095 per
share (subject to adjustment for certain transactions that have a dilution impact on the conversion price), an unchanged coupon
interest rate of 8% per annum with interest payable quarterly through the issue of new Bannerman shares at a price equal to the
5-day VWAP of Bannerman’s shares prior to the date of issue or cash in certain circumstances, and the extension fee of
A$160,000 satisfied through the issue of 2,539,683 new Bannerman shares. The amended convertible note with RCFIV was
approved by the Bannerman shareholders at the Annual General Meeting on 22 November 2013. The amendments came into
effect after 31 March 2014.
At the refinancing date of 22 November 2013, the existing convertible note was derecognised and the amended RCFIV
convertible note was recognised for accounting purposes. At the date of recognition of the amended note, its debt and equity
components were separated according to their fair values. Total proceeds of the issue were allocated to the respective fair
values of the equity and debt components with the effect that the discount on the debt component is being amortised into
earnings as interest expense. Accordingly, over the term of the convertible note, the debt component will increase to the face
value of A$8 million at the maturity date of 30 September 2016. The interest expense recorded on the convertible note reflects
BANNERMAN RESOURCES LIMITED
AND CONTROLLED ENTITIES
12
NOTES TO THE FINANCIAL STATEMENTS
FOR THE THREE MONTH PERIOD ENDED 30 SEPTEMBER 2015
(EXPRESSED IN AUSTRALIAN DOLLARS)
an effective interest rate of approximately 20% over the life of the note. Included in trade and other payables is an amount of
A$160,000 for accrued 8% coupon interest on the RCFIV convertible note to 30 September 2015 (June 2015: A$160,000).
Resource Capital Fund VI L.P. (“RCFVI”) convertible note
In April 2014, Bannerman reached an agreement with its major shareholder Resource Capital Funds (“RCF”) on a A$4 million
convertible note facility with RCFVI with a maturity date of September 30, 2016. The key terms of the note are a conversion price
of A$0.095 per share (subject to adjustment for certain transactions that have a dilution impact on the conversion price), a
coupon interest rate of 8% per annum with interest payable quarterly through the issue of new Bannerman shares at a price
equal to the 5-day VWAP of Bannerman’s shares prior to the date of issue or cash in certain circumstances, and the establishment
fee of A$120,000 satisfied through the issue of 1,714,286 new Bannerman shares. The convertible note with RCFVI was approved
by the Bannerman shareholders at the Extraordinary General Meeting on 19 June 2014. The note was drawn down in full on 26
June 2014.
At the date of recognition of the RCFVI note, its debt and equity components were separated according to their fair values. Total
proceeds of the issue were allocated to the respective fair values of the equity and debt components with the effect that the
discount on the debt component is being amortised into earnings as interest expense. Accordingly, over the term of the
convertible note, the debt component will increase to the face value of A$4 million at the maturity date of 30 September 2016.
The interest expense recorded on the convertible note reflects an effective interest rate of approximately 26% over the life of the
note. Included in trade and other payables is an amount of A$80,000 for accrued 8% coupon interest on the RCFVI convertible
note to 30 September 2015 (June 2015: A$80,000).
Both convertible notes are secured by a fixed and floating charge over the Company’s assets and a share mortgage over the
Company’s shares in its subsidiary entities holding indirect and direct interests in the Etango Project.
Under the terms of both convertible notes, the Company must, unless otherwise approved, maintain a minimum cash and cash
equivalents balance of not less than A$1,250,000. The requirement was waived on 1 September 2015.
In accordance with the terms of both convertible notes, a review event arises upon a change in control of the Company, defined
to be where a third party acquires a relevant interest in 50% or more of the securities in the Company. In this circumstance, RCF
may decide at its absolute discretion to require the Company to repay the convertible notes (including all accrued interest
thereon) or to convert the convertible notes (including all accrued interest thereon) to shares in Bannerman.
On 11 November 2015, the Company announced the signing of agreements with Resource Capital Fund IV L.P. and Resource
Capital Fund VI L.P., which if approved by shareholders, will eliminate the convertible notes. The agreement entails the
conversion of A$8 million of the convertible notes held by RCF into Bannerman shares at the given conversion price of A$0.075
per share; grant of a 1.5% royalty over the Etango Project to RCF for A$6 million, comprising A$2 million in cash and
extinguishment of the residual convertible notes held by RCF (A$4 million).
11. PROVISIONS – NON-CURRENT
Three months ended
30 September 2015
$’000
Balance 1 July 2015
Arising during the year
Unwinding of discount
Foreign exchange translation movements
399
8
(16)
391
Year ended
30 June 2015
$’000
399
399
The Group makes full provision for the future cost of the environmental rehabilitation obligations relating to the
heap leach demonstration plant on a discounted basis at the time of the activity.
The rehabilitation provision, based on the Group’s internal estimates, represents the present value of the future
rehabilitation costs relating to the heap leach demonstration plant. Assumptions based on the current economic
environment have been made, which management believes are a reasonable basis upon which to estimate the
future liability. These estimates are reviewed regularly to take into account any material changes to the
assumptions. However, actual rehabilitation costs will ultimately depend upon future market prices for the
necessary rehabilitation works required that will reflect market conditions at the relevant time. Furthermore, the
timing of the rehabilitation is likely to depend on when the pre-development activities c
Share your feedback
Discover