Half Yearly Report and Accounts
Released
Released
Announcement PDF
Bannerman Energy Ltd W bannermanenergy.com
Suite 7, 245 Churchill Avenue, Subiaco, Western Australia 600 T +61 8 9381 1436
PO Box 1973, Subiaco, Western Australia 6008 E info@bmnenergy.com
BANNERMAN ENERGY LTD
AND CONTROLLED ENTITIES
FINANCIAL REPORT
FOR THE HALF YEAR ENDED
31 DECEMBER 2025
FINANCIAL REPORT
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
CONTENTS
Corporate Directory ................................................................................................................................................ 1
Directors’ Report..................................................................................................................................................... 2
Auditor’s Independence Declaration ...................................................................................................................... 9
Consolidated Statement of Comprehensive Income ............................................................................................ 10
Consolidated Statement of Financial Position ...................................................................................................... 11
Consolidated Cash Flow Statement ...................................................................................................................... 12
Consolidated Statement of Changes in Equity...................................................................................................... 13
Notes to the Financial Statements........................................................................................................................ 14
Directors’ Declaration ........................................................................................................................................... 29
Auditor’s Review Report ....................................................................................................................................... 30
ABOUT BANNERMAN ENERGY LTD
About Bannerman - Bannerman Energy Ltd is a uranium development business listed on the Australian and
Namibian stock exchanges and traded on the OTCQX Market in the US. Its flagship asset is the advanced Etango
Uranium Project located in the Erongo Region of Namibia.
Etango has benefited from extensive exploration and feasibility activity over the past 15 years. The Etango
tenement possesses a globally large-scale uranium mineral resource1
. In December 2022, a Definitive Feasibility
Study (DFS)2
was completed on the Etango-8 Project, confirming to a definitive-level the strong technical and
economic viability of conventional open pit mining and heap leach processing of the Etango deposit at 8Mtpa
throughput (for average annual output of 3.5 Mlbs U3O8). In March 2024, a scoping study3
demonstrated the
capacity to expand annual production to 6.7 Mlbs U3O8.
Etango’s advanced credentials are further highlighted by the construction and multi-year operation of the Etango
Heap Leach Demonstration Plant, which comprehensively de-risked the conventional acid heap leach process to
be utilised on the Etango ore. All environmental approvals have been received for the proposed Etango mine and
external mine infrastructure, based on a 12-year environmental baseline. Bannerman was awarded the Mining
Licence for Etango in December 2023 and is progressing all key project workstreams towards a targeted positive
Final Investment Decision (FID) in parallel with strengthening uranium market fundamentals.
Namibia is a premier uranium investment jurisdiction, with a 45-year history of uranium production and export,
excellent infrastructure and support for uranium mining from both government and community. As the world’s
third largest producer of uranium, Namibia is an ideal development jurisdiction boasting political stability,
security, a strong rule of law and an assertive development agenda. The Bannerman team has ample direct
experience in the development, construction and operation of uranium projects in Namibia, as well as extensive
links into the downstream nuclear power industry.
Bannerman has long established itself as an Environmental, Social and Governance (ESG) leader in the uranium
and nuclear energy sector. It is also a leader within Namibia on social development and community engagement
and exercises best-practice governance in all aspects of its business. This was recently recognised with receipt of
the 2023 African Mining Indaba’s ESG Award for Community Engagement.
More information is available on Bannerman’s website at www.bannermanenergy.com.
1 and 2 Refer to Bannerman’s ASX release dated 6 December 2022, Etango-8 Definitive Feasibility Study. Bannerman confirms that it is not aware of any new
information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinning the
estimates in that ASX release continue to apply and have not materially changed.
3 Refer to Bannerman’s ASX release dated 18 March 2024, Etango-XP and Etango-XT Scoping Study.
1
CORPORATE DIRECTORY
EXECUTIVE CHAIRMAN
Brandon Munro
CHIEF EXECUTIVE OFFICER & MANAGING DIRECTOR
Gavin Chamberlain
CHIEF FINANCIAL OFFICER & JOINT COMPANY SECRETARY
Stephen Herlihy
JOINT COMPANY SECRETARY
Karen Logan
NON-EXECUTIVE DIRECTORS
Alison Terry (Lead Independent Director & Deputy Chair)
Felicity Gooding
Clive Jones
Bruce McFadzean
Danny Goeman
PRINCIPAL & REGISTERED OFFICE
Suite 7, 245 Churchill Avenue
SUBIACO WA 6008
Australia
Telephone: +61 (8) 9381 1436
AUDITORS
Ernst & Young
9 The Esplanade
PERTH WA 6000
Telephone: +61 (8) 9429 2222
Facsimile: +61 (8) 9429 2432
SHARE REGISTRAR
Computershare (Australia)
Level 17
221 St George’s Terrace
PERTH WA 6000
Telephone from within Australia: 1300 850 505
Telephone from outside Australia: +61 (3) 9415 4000
Facsimile: +61 (8) 9323 2033
STOCK EXCHANGE LISTINGS
Australian Securities Exchange (ASX Code: BMN)
Namibian Stock Exchange (NSX Code: BMN)
OTC Markets (OTCQX Code: BNNLF)
2
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
The directors submit the consolidated financial report of Bannerman Energy Ltd (“Bannerman” or the “Company”)
and its controlled entities (the “Group”) for the half year ended 31 December 2025.
Amounts are expressed in Australian dollars unless otherwise noted.
DIRECTORS
The names of the Company’s directors in office during the half year and until the date of this report are set out
below. Directors were in office for this entire period unless otherwise stated.
Brandon Munro Executive Chairman (resigned as Managing Director 3 March 2026)
Alison Terry Lead Independent Director and Deputy Chair
Gavin Chamberlain Chief Executive Officer and Managing Director (appointed Managing Director 3 March 2026)
Felicity Gooding Non-executive Director
Clive Jones Non-executive Director
Bruce McFadzean Non-executive Director
Danny Goeman Non-executive Director (appointed 3 March 2026)
JOINT COMPANY SECRETARIES
Stephen Herlihy
Karen Logan
REVIEW AND RESULTS OF OPERATIONS
Principal activities
Bannerman is an exploration and development company with uranium interests in Namibia, a southern African
country which is a premier uranium mining jurisdiction. Bannerman’s principal asset is its 95%-owned Etango
Project situated southwest of CNNC’s Rössing uranium mine and CGNPC’s Husab Mine and to the northwest of
Paladin Energy’s Langer-Heinrich mine. Etango is one of the world’s largest undeveloped uranium deposits.
Bannerman is focused on the development of a large open pit uranium operation at Etango.
The principal activities of the Group during the reporting period were execution of site early works for the project
and continuation of detailed design of the project.
Operating Result
The Group’s net loss before tax of $853,000 for the half year ended 31 December 2025 (31 December 2024: net
loss before tax of $2,703,243) was attributable primarily to corporate and administrative expenses and non-cash
share-based compensation expenses and a share of losses in an equity-accounted investment of $248,449 (31
December 2024: $99,532 loss).
Interest income for the half year ended 31 December 2025 was $2,420,032 (31 December 2024: $2,257,291).
Cash Position
Cash and cash equivalents were $89,276,289 as at 31 December 2025 compared with $46,203,755 as at 30 June
2025.
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
3
ETANGO URANIUM PROJECT (BANNERMAN 95%)
Figure 1: The Etango Project (ML 250) is close to infrastructure and the towns of Swakopmund and Walvis Bay.
Overview
The Etango Project is one of the world’s largest undeveloped uranium deposits, located in the Erongo uranium
mining region of Namibia, which hosts the Rössing, Husab and Langer-Heinrich mines. Etango is 73km by road from
Walvis Bay, one of southern Africa’s busiest deep-water ports through which uranium has been exported for over
45 years. Road, rail, electricity and water networks are all located nearby.
Regulatory Approvals
Etango is fully permitted for construction and operations. Mining Licence ML 250 was granted in December 2023.
Environmental Clearance Certificates covering the mine site, linear infrastructure and the Walvis Bay acid storage
facility are current and provide permitting certainty for contractors, financiers and other counterparties.
Safety
Safety performance at Etango remained strong during the period. The Project has now operated for more than 16
years without a Lost Time Injury. During the half year, the on-site contractor workforce increased to more than
370 personnel as early works activities ramped up across multiple construction fronts, with safety systems and site
controls maintained in line with established project standards.
Early Works and Long Lead Construction Activities
Early works progressed materially during the half year and continued to track in line with approved budgets,
schedules, and the Company’s stage gated development framework. Execution of early works was supported by a
progressive ramp up in contractor resources across civil, aggregate, and concrete packages, enabling parallel
advancement of bulk earthworks, heap leach infrastructure, and permanent plant foundations. The 24-month bulk
earthworks contract, awarded in August 2024, advanced beyond the halfway point, with heap leach pad
construction and excavation of solution ponds continuing in line with plan. Progress in these areas supports the
orderly sequencing of subsequent civil, structural and mechanical activities.
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
4
Concrete construction works commenced during the period, with Phase 1 and Phase 2A concrete packages placed
and executed in accordance with the development schedule. Foundations for the primary crusher and stockpile
tunnel were completed, marking a transition from enabling works to permanent plant infrastructure.
Figure 2: The first concrete pour at the primary crusher site has been completed. A total of 500m3 was poured at an
average flow rate of 40m3 per hour.
Long-lead procurement continued in parallel with construction activities. The High-Pressure Grinding Rolls (HPGR)
tertiary crusher, a key component of the dry plant circuit, was successfully manufactured, transported and
delivered to site during the December 2025 quarter, aligning equipment availability with the planned construction
sequence.
Figure 3: The HPRG tertiary crusher has arrived on site at Etango
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
5
Infrastructure and Utilities
Construction water and power arrangements are in place to support early works and full-scale construction.
Installation of Phase 1 of the permanent water supply pipeline progressed during the period, with works focused
on pump station foundations and the Swakop River crossing. The permanent operational water supply agreement
with NamWater has been reviewed by Bannerman and continues to progress toward execution, aligned with Final
Investment Decision (FID) timing.
Figure 4: The permanent water supply pipeline bridge base to cross the Swakop River is nearing completion
Permanent operational power is planned to be supplied from the national grid via NamPower’s Kuiseb substation.
A definitive supply arrangement has been agreed, with detailed design of the required feeder bay and associated
infrastructure underway.
Planning for sulphuric acid supply advanced during the period. Detailed design and geotechnical investigations
progressed for the Walvis Bay port acid storage and handling facility, which is intended to support both locally
sourced and imported acid, providing flexibility and security of supply for operations.
Detailed Design
Detailed engineering continued under the leadership of Wood Group PLC, working with Bannerman’s Namibian
owner’s team. Dry plant engineering advanced to a high level of completion, with detailed modelling and Issued-
For-Construction drawings supporting the execution of concrete and structural packages. Wet plant engineering
progressed in parallel, with emphasis on design validation and incorporation of certified vendor data to support
cost and schedule certainty at later contract awards.
Project Funding and Offtake
Bannerman continued to progress its Etango funding strategy during the half year, assessing a range of project and
corporate financing options, including debt, offtake-linked structures and potential strategic partnerships. Azure
Capital and Vermilion Partners (global affiliates of Natixis) continue to advise on optimising the funding mix.
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
6
Offtake marketing remains aligned with Bannerman’s phased development approach. During the period, the
Company executed two initial offtake agreements with Tier 1 utilities in September 2025. Bannerman continues
to engage with a broad range of global utilities and counterparties, with the objective of progressively layering
long-term sales commitments that support project financing outcomes while retaining flexibility ahead of a Final
Investment Decision. The execution of these initial offtake agreements represents a further step in the systematic
advancement of Etango as a future uranium supply source.
Technical Disclosures
Certain disclosures in this report, including management's assessment of Bannerman’s plans and projects,
constitute forward-looking statements that are subject to numerous risks, uncertainties and other factors relating
to Bannerman’s operation as a mineral development company that may cause future results to differ materially
from those expressed or implied in such forward-looking statements. Full descriptions of these risks can be found
in Bannerman’s various statutory reports and announcements. Readers are cautioned not to place undue reliance
on forward-looking statements. Bannerman expressly disclaims any intention or obligation to update or revise any
forward-looking statements whether as a result of new information, future events or otherwise.
The information in this report as it relates to Exploration Results is based on, and fairly represents, information
and supporting documentation prepared by Mr Marthinus Prinsloo. Mr Prinsloo is a full time employee of the
Company and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Prinsloo has
sufficient experience which is relevant to the style of mineralisation and the type of deposit under consideration,
and to the activities, which he is undertaking. This qualifies Mr Prinsloo as a “Competent Person” as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’
and a “Qualified Person” as defined by Canadian National Instrument 43-101. Mr Prinsloo consents to the inclusion
in this announcement in the form and context in which it appears. Mr Prinsloo holds shares and performance
rights in Bannerman Energy Ltd.
The Etango Project is based on a resource estimate compiled or reviewed by Mr Ian Glacken, Principal Consultant
at Snowden Optiro Pty Ltd and a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Glacken has
sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”, is an independent
consultant to Bannerman.
The Ore Reserves of the Etango Project is based on information compiled or reviewed by Mr Werner K Moeller, a
Director since 2016 of Qubeka Mining Consultants CC based in Klein Windhoek, Namibia. Prior to 2016 Mr. Moeller
was a Director of VBKom Consulting Engineers (Pty) Ltd based in Centurion, South Africa from 2008. Mr Moeller is
a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM nr. 329888), a Member of the South
African Institute of Mining and Metallurgy (MSAIMM nr. 704793) and a Member of the Canadian Institute of
Mining, Metallurgy and Petroleum (MCIM nr. 708163). He graduated from the University of Pretoria, South Africa
and holds a Bachelor degree, majoring in Mine Engineering (2001) and an Honours degree, majoring in Industrial
Engineering (2002). Mr Moeller is a practising mining engineer, having practiced his profession continuously since
2002, and has sufficient experience relevant to the style of mineralisation and types of deposits under
consideration and to the activity which is being undertaken to qualify him as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
7
CORPORATE
Issued Securities
At the date of this report, Bannerman has 207,670,532 ordinary shares on issue.
The Company completed an equity raising of $85,000,000 in a placement to new and existing institutional and
sophisticated investors. Completion of the Placement occurred on Thursday 3 July 2025 when the Company issued
26,562,500, fully paid ordinary shares at an issue price of $3.20. The Placement utilised the Company’s existing
issuance capacity under ASX Listing Rule 7.1.
The proceeds of the funding will be utilised in the continuing development of the Etango Project and will fund the
detailed engineering design, early works program and provide general working capital.
As at 31 December 2025, Bannerman had on issue 2,558,484 unlisted zero exercise price options issued under the
shareholder-approved Employee Incentive Plan (“EIP”) and 175,570 unlisted zero exercise price options issued
under the Non-Executive Director Share Incentive Plan (“NEDSIP”). The EIP incentives are subject to various
performance targets and continuous employment periods. The NEDSIP incentives are subject to continuous
employment periods.
Cancellation and Issue of Securities
The Company advised during the period that the following securities in Bannerman were cancelled or issued:
227,664 unlisted options were exercised, and a corresponding number of shares were issued.
33,997 unlisted employee options have, pursuant to the terms of the Employee Incentive Plan (EIP), been
forfeited and cancelled following non-satisfaction of the relevant performance criteria.
2,039,608 fully paid ordinary shares were issued upon vesting of unlisted employee performance rights
in accordance with the terms of the EIP and Non-Executive Director Share Incentive Plan (NEDSIP).
752,082 unlisted options were granted (with 687,082 being issued) in accordance with the EIP and NEDSIP
as approved by shareholders on 13 November 2025.
Namibia Critical Metals Inc additional investment
On 26 November 2025, the Company was issued a further 3,671,428 shares in Namibia Critical Metals Inc. (NMI)
following the exercise of 3,671,428 free-attaching warrants at an exercise price of C$0.05 per share. Subsequently,
on 19 December 2025, the Company was issued a further 3,983,333 shares in NMI following the exercise of
3,983,333 free-attaching warrants at an exercise price of C$0.10 per share. These transactions increased the
Company’s interest in NMI from 43.0% to 43.5%. The Company will continue to account for its investment as an
associate using the equity method.
Annual General Meeting
Bannerman held its Annual General Meeting on 13 November 2025, all resolutions put to the meeting were passed
by poll.
SUBSEQUENT EVENTS
Strategic Joint Venture and Investment Agreement – Etango Project
On 12 February 2026, the Company announced the execution of a binding Share Subscription Agreement and
associated joint venture documentation with CNNC Overseas Limited (CNOL), a subsidiary of China National
Uranium Corporation and part of China National Nuclear Corporation, in respect of the funding, development and
operation of the Etango Uranium Project.
Under the transaction:
DIRECTORS’ REPORT
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
8
CNOL will subscribe for a 45% interest in Bannerman Energy (UK) Ltd (JVCo), which holds a 95% interest
in the Etango Project.
CNOL will invest up to US$321.5 million at completion, comprising US$294.5 million into JVCo and up to
US$27 million payable to Bannerman to reimburse 45% of project expenditure incurred from 1 July 2025
to completion.
CNOL will be entitled to 60% of life of mine production from Etango under arm’s length, market-based
offtake arrangements, with Bannerman retaining independent marketing rights over the remaining 40%.
Future capital expenditure and operating funding will be contributed pro rata in accordance with the 55%
Bannerman and 45% CNOL ownership structure of JVCo.
Completion of the transaction is subject to customary conditions precedent, including relevant Chinese regulatory
approvals, CNUC shareholder approval, clearance from the Namibian Competition Commission, amendment to the
One Economy Foundation funding arrangements, and execution of key infrastructure supply contracts. The long
stop date for satisfaction of conditions precedent is 30 September 2026, subject to extension by mutual consent.
Completion is targeted for mid-2026, with a Final Investment Decision on the Etango Project expected shortly
thereafter.
Other than the matter described above, there have been no other events occurring after 31 December 2025 that
have significantly affected, or may significantly affect, the operations of the Group, the results of those operations
or the state of affairs of the Group.
AUDITOR’S INDEPENDENCE DECLARATION
Section 307C of the Corporations Act 2001 requires the Company’s auditors to provide the directors of Bannerman
with an Independence Declaration in relation to the half year ended 31 December 2025. The Independence
Declaration is attached to and forms part of this Directors’ Report.
This report is made in accordance with a resolution of the Directors.
ROUNDING
Amounts in this report and the accompanying financial report have been rounded to the nearest thousand dollars
(A$’000) unless otherwise stated under the option available to the Company under ASIC Corporations (Rounding
in Financial/Directors’ Reports) Instrument 2016/191. The Company is an entity to which the class order applies.
Signed in accordance with a resolution of the Board of Directors.
_______________________
Brandon Munro
Executive Chairman
Perth
3 March 2026
A member firm of Ernst & Young Global Limited
Liability limited by a scheme approved under Professional Standards Legislation
Ernst & Young
9 The Esplanade
Perth WA 6000 Australia
GPO Box M939 Perth WA 6843
Tel: +61 8 9429 2222
Fax: +61 8 9429 2436
ey.com/au
Auditor’s independence declaration to the directors of Bannerman
Energy Ltd
As lead auditor for the review of the half-year financial report of Bannerman Energy Ltd for the
half-year ended 31 December 2025, I declare to the best of my knowledge and belief, there have
been:
a. No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review;
b. No contraventions of any applicable code of professional conduct in relation to the review; and
c. No non-audit services provided that contravene any applicable code of professional conduct in
relation to the review.
This declaration is in respect of Bannerman Energy Ltd and the entities it controlled during the
financial period.
Ernst & Young
J K Newton
Partner
3 March 2026
10
CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
6 Months Ended
31 December
2025 2024
Note $'000 $'000
Interest revenue 2,420 2,257
Other income 2 11 -
Administration and corporate expense 3(a) (2,684) (1,720)
Depreciation expense (53) (57)
Finance expense (12) (9)
Foreign exchange currency gains/(losses) (115) 40
Impairment of equity-accounted investments 11 - (1,421)
Share of profit/(losses) from equity-accounted investments 11 (248) (100)
Staff expense 3(b) (1,591) (1,654)
Realised gains/(losses) on disposal of plant and equipment - 5
Unrealised fair value losses on financial assets 1,419 (44)
Loss before income tax (853) (2,703)
Income tax benefit - -
Net loss for the half year (853) (2,703)
Other comprehensive income
Items that may be reclassified subsequently to profit or loss
Foreign currency translation 8,271 3,603
Other comprehensive income for the half year, net of tax 8,271 3,603
Total comprehensive income, net of tax 7,418 900
Net loss is attributable to:
Equity holders of Bannerman Energy Ltd (770) (2,658)
Non-controlling interest (83) (45)
(853) (2,703)
Total comprehensive income attributable to:
Equity holders of Bannerman Energy Ltd 7,410 938
Non-controlling interest 8 (38)
7,418 900
Weighted average number of shares ('000) 205,869 161,119
Basic and dilutive loss pert attributable share to the ordinary equity holders
of the Company (cents per share) (0.41) (1.68)
The above consolidated statement of comprehensive income should be read in conjunction with the accompanying
notes.
11
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
Note 31 December 2025 30 June 2025
$’000 $’000
CURRENT ASSETS
Cash and cash equivalents 4 89,276 46,204
Financial assets 5 12,677 12,432
Other receivables 6 5,386 1,797
Other current assets 7 455 582
TOTAL CURRENT ASSETS 107,794 61,015
NON-CURRENT ASSETS
Exploration and evaluation expenditure 8 124,092 104,832
Investments accounted for using the equity method 11 3,928 2,427
Property, plant and equipment 9 51,729 26,975
Right of use assets 10 73 70
Other non-currents assets 7 61 27
TOTAL NON-CURRENT ASSETS 179,883 134,331
TOTAL ASSETS 287,677 195,346
CURRENT LIABILITIES
Trade and other payables 12 8,809 6,243
Lease liabilities 10 73 68
Provisions 13 281 295
TOTAL CURRENT LIABILITIES 9,163 6,606
NON-CURRENT LIABILITIES
Provisions 13 3,313 2,053
TOTAL NON-CURRENT LIABILITIES 3,313 2,053
TOTAL LIABILITES 12,476 8,659
NET ASSETS 275,201 186,687
EQUITY
Contributed equity 14 373,142 292,391
Reserves 15 41,979 31,760
Accumulated losses (135,228) (134,458)
TOTAL PARENT ENTITY INTEREST 279,893 189,693
Non-controlling interest (4,692) (3,006)
TOTAL EQUITY 275,201 186,687
The above statement of financial position should be read in conjunction with the accompanying notes.
12
CONSOLIDATED CASH FLOW STATEMENT
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
6 Months Ended
31 December
2025 2024
$’000 $’000
CASHFLOWS FROM OPERATING ACTIVITIES
Payments for staff costs (871) (914)
Payments for administration and corporate costs (5,488) (2,056)
Interest received 2,027 1,593
Interest and other costs of finance paid (4) (4)
Other income 21 -
Net cash utilised in operating activities (4,315) (1,381)
CASHFLOWS FROM INVESTING ACTIVITIES
Payments for exploration and evaluation (13,482) (9,505)
Payments to acquire investments in associates (642) (270)
Payments to acquire financial assets - (13)
Payments to acquire property, plant and equipment (19,294) (12,283)
Proceeds from the disposal of property, plant and equipment 6 9
Loans provided to related parties - (78)
Payments for deposits and bonds (other non-current assets) (7) (4)
Net cash utilised in investing activities (33,419) (22,144)
CASHFLOWS FROM FINANCING ACTIVITIES
Proceeds from issue of shares 85,000 85,001
Transaction costs related to issue of shares (4,249) (4,535)
Repayment of lease liabilities/borrowings (80) (22)
Payments for bank security deposits - -
Payment for other receivables and deposits - -
Net cash provided by financing activities 80,671 80,444
Net decrease in cash and cash equivalents 42,937 56,919
Cash and cash equivalents at beginning of period 46,204 24,046
Effects of exchange rate changes on the balance of cash held in
foreign currencies
135 146
Cash and cash equivalents at end of period 89,276 81,111
The above cash flow statement should be read in conjunction with the accompanying notes.
13
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF YEAR ENDED 31 DECEMBER 2025
Issued
Capital
Share Based
Payment
Reserve
Foreign
Currency
Reserve
Equity
Reserve
Accumulated
Losses
Non-
controlling
Interest
Total
$’000 $’000 $’000 $’000 $’000 $’000 $’000
Balance at 1 July 2025 292,391 64,470 (33,472) 762 (134,458) (3,006) 186,687
Loss for the period - - - - (770) (83) (853)
Other comprehensive loss - - 8,180 - - 91 8,271
Total comprehensive loss for the period - - 8,180 - (770) 8 7,418
Shares issued during the period 85,000 - - - - - 85,000
Cost of issuing shares (4,249) - - - - - (4,249)
Share-based payments - 858 - - - - 858
Capital contributions (Bannerman Namibia) - - - 1,181 - (1,694) (513)
Total equity at 31 December 2025 373,142 65,328 (25,292) 1,943 (135,228) (4,692) 275,201
Balance at 1 July 2024 211,925 62,700 (36,740) (826) (130,358) (990) 105,711
Loss for the period - - - - (2,658) (45) (2,703)
Other comprehensive loss - - 3,596 - - 7 3,603
Total comprehensive loss for the period - - 3,596 - (2,658) (38) 900
Shares issued during the period 85,001 - - - - - 85,001
Cost of issu
Share your feedback
Discover