Chair's Address to Shareholders
Released
Released
Announcement PDF
Building a uranium production
business
Annual General Meeting
15 November 2024
ASX:BMN | OTCQX:BNNLF | NSX:BMN
CAUTIONARY STATEMENT
Important notices
Of the Mineral Resources scheduled for extraction and recovery in the Etango-8 Definitive Feasibility Study (DFS) and Etango-XP / XT Scoping Study (Scoping Study), 100% are classified as Measured or Indicated.
Bannerman Energy Ltd (Bannerman, the Company) confirms that there are no Inferred Resources included in the Etango-8 DFS or Etango-XP / XT Scoping Study production schedules.
The Mineral Resources underpinning the Ore Reserve and production target in the Etango-8 DFS (and the production target in the Etango-XP / XT Scoping Study) have been prepared by a competent person in accordance
with the requirements of the JORC Code (2012). The Competent Person’s Statement is found overleaf. For full details of the Mineral Resource estimate, please refer to the ASX release dated 6 December 2022, “Etango-8
Definitive Feasibility Study”. Bannerman confirms that it is not aware of any new information or data that materially affects the Mineral Resource estimate included in that release. All material assumptions and technical
parameters underpinning the Mineral Resource estimate in that ASX release continue to apply and have not materially changed.
This release contains a series of forward-looking statements. Generally, the words "expect," “potential”, "intend," "estimate," "will" and similar expressions identify forward-looking statements. By their very nature forwardlooking statements are subject to known and unknown risks and uncertainties that may cause our actual results, performance or achievements, to differ materially from those expressed or implied in any of our forward-looking
statements, which are not guarantees of future performance. Statements in this release regarding Bannerman’s business or proposed business, which are not historical facts, are forward-looking statements that involve risks
and uncertainties, such as Mineral Resource estimates, Ore Reserve estimates, market prices of metals, capital and operating costs, changes in project parameters as plans continue to be evaluated, continued availability of
capital and financing and general economic, market or business conditions, and statements that describe Bannerman’s future plans, objectives or goals, including words to the effect that Bannerman or management expects
a stated condition or result to occur. Forward-looking statements are necessarily based on estimates and assumptions that, while considered reasonable by Bannerman, are inherently subject to significant technical,
business, economic, competitive, political and social uncertainties and contingencies. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties.
Actual results in each case could differ materially from those currently anticipated in such statements. Investors are cautioned not to place undue reliance on forward-looking statements, which speak only as of the date they
are made.
Bannerman has concluded that it has a reasonable basis for providing these forward-looking statements and the forecast information included in this ASX release. This includes a reasonable basis to expect that it will be able
to fund the development of Etango upon successful delivery of key development milestones as and when required. The detailed reasons for these conclusions are outlined in the ASX release dated 6 December 2022,
“Etango-8 Definitive Feasibility Study”, in the section titled, “Funding pathway”. While Bannerman considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be
correct or that the range of outcomes indicated by the DFS will be achieved.
To achieve the range of outcomes indicated in the DFS, pre-production funding in excess of US$353M will likely be required. There is no certainty that Bannerman will be able to source that amount of funding when required.
It is also possible that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Bannerman’s shares. It is also possible that Bannerman could pursue other value realisation
strategies such as a sale, partial sale or joint venture of the Etango Project. These could materially reduce Bannerman’s proportionate ownership of the Etango Project.
For full details of the Etango-8 DFS and Etango-XP / XT Scoping Study, please refer to ASX releases dated 6 December 2022, “Etango-8 Definitive-Feasibility Study” and 18 March 2024, “Etango-XP and Etango-XT Scoping
Study”. In addition, please refer to ASX release dated 11 June 2024, “Etango-8 FEED Complete and Costs Updated; Detailed Design Commenced”. Other than the updated capital and operating costs expressed in the 11
June 2024 release, Bannerman confirms that it is not aware of any new information or data that materially affects the information included in the releases of 6 December 2022 and 18 March 2024. All material assumptions
and technical parameters underpinning the estimates in those ASX releases continue to apply and have not materially changed.
2
FORWARD LOOKING AND COMPETENT PERSON STATEMENTS
Important notices
Forward Looking Statements
Competent Person Statement
This presentation includes various forward looking statements which are identified by the use of forward looking words such as
“may”, “could”, “will”, “expect”, “believes”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar
words and may include, without limitation statements regarding plans, strategies and objectives of management, anticipated
production or construction commencement dates and expected costs or production outputs. Statements other than statements of
historical fact may be forward looking statements. Bannerman believes that it has reasonable grounds for making all statements
relating to future matters attributed to it in this presentation.
Mineral Resources
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of
resources or reserves, political and social risks, changes to the regulatory framework within which the Company operates or may
in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel,
industrial relations issues and litigation. Investors should note that any reference to past performance is not intended to be, nor
should it be, relied upon as a guide to any future performance.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the future.
The Company does not give any assurance that the assumptions on which forward looking statements are based will prove to be
correct, or that the Company’s business or operations will not be affected in any material manner by these or other factors not
foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts to identify factors that would cause actual actions, events or results to differ materially from those
disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or
events not to be anticipated, estimated or intended, and many events are beyond the reasonable control of the Company.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Actual results, values, performance
or achievements may differ materially from results, values, performance or achievements expressed or implied in any forward
looking statement. None of Bannerman, its officers or any of its advisors make any representation or warranty (express or implied)
as to the accuracy or likelihood of fulfilment of any forward looking statement, or any results, values, performance or achievements
expressed or implied in any forward looking statement except to the extent required by law.
The information in this release relating to the Mineral Resources (November 2021) of the Etango Project is based on a resource
estimate compiled or reviewed by Mr Ian Glacken, Principal Consultant at Snowden Optiro Pty Ltd and a Fellow of the
Australasian Institute of Mining and Metallurgy. Mr Glacken has sufficient experience that is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”, is an
independent consultant to Bannerman and a Qualified Person as defined by Canadian National Instrument 43-101. Mr Glacken
consents, and provides corporate consent for Snowden Optiro Pty Ltd, to the inclusion in this release of the matters based on his
information in the form and context in which it appears.
Ore Reserves
The information in this release relating to the Ore Reserves (June 2022) of the Etango-8 DFS Project is based on information
compiled or reviewed by Mr Werner K Moeller, a Director since 2016 of Qubeka Mining Consultants CC based in Klein Windhoek,
Namibia. Prior to 2016 Mr. Moeller was a Director of VBKom Consulting Engineers (Pty) Ltd based in Centurion, South Africa from
2008. Mr Moeller is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM nr. 329888), a Member of the
South African Institute of Mining and Metallurgy (MSAIMM nr. 704793) and a Member of the Canadian Institute of Mining,
Metallurgy and Petroleum (MCIM nr. 708163). He graduated from the University of Pretoria, South Africa and holds a Bachelor
degree, majoring in Mine Engineering (2001) and an Honours degree, majoring in Industrial Engineering (2002). Mr Moeller is a
practising mining engineer, having practiced his profession continuously since 2002, and has sufficient experience relevant to the
style of mineralisation and types of deposits under consideration and to the activity which is being undertaken to qualify him as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. He has read and understood the requirements of the 2012 Edition of the Australasian Code for
Reporting of Exploration Results and the Technical Report has been prepared in compliance with that code. Mr Moeller consents
to the filing of this release with any stock exchange and other regulatory authority and any publication by them for regulatory
purposes, including electronic publication in the public company files on their websites accessible by the public. Mr Moeller
furthermore does not have nor does he expect to receive a direct or indirect interest in the Etango property of Bannerman, and he
does not beneficially own, directly or indirectly, any securities of Bannerman or any associate or affiliate of such company. Mr
Moeller consents to the inclusion in this release of the matters based on his information in the form and context in which it
appears.
Forward looking statements in this release are given as at the date of issue only. Subject to any continuing obligations under
applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake any
obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or
circumstances on which any such statement is based.
3
ABOUT BANNERMAN ENERGY
The leading nextgeneration uranium
supplier of choice
Our flagship Etango Project is one of the world’s
largest, most advanced uranium development assets.
Benefiting from its location in Namibia, a highly
established uranium production powerhouse.
Strongly de-risked through extensive drilling, technical
evaluation and process demonstration plant.
Fully permitted with a clear pathway to development.
Readily positioned to capitalise on the unfolding
uranium market recovery.
4
BUILDING A URANIUM PRODUCTION BUSINESS
Building
Etango
Building the
Organisation
Building
Stakeholder
Value
Q&A
5
BUILDING A URANIUM PRODUCTION BUSINESS
Building Etango
Construction
progress
Next priorities
Phased
greenlight
approach
6
BUILDING ETANGO
7
BUILDING ETANGO
8
BUILDING ETANGO
9
PROGRESS ON-SITE
PROACTIVE
RELIABLE
RESPECTFUL
INTEGRITY
DIVERSE THINKING
10
BUILDING ETANGO
Next priorities
11
BUILDING ETANGO
Phased greenlight approach
12
BUILDING ETANGO
Financing phase
Roadmap to production
Development phase
Production phase
❑ Initial offtake agreements
Expansion option
Contracting
Financing
❑ Build / optimise
contract portfolio
❑ Strategic / project financing
❑ Target FID window
expanded into 2025
✓ FEED/CBE
Construction
Mining
licence
granted
✓ Site road
✓ Temp water
❑ Detailed design
❑ Bulk earthworks
❑ Internal access roads contract
❑ Mine and infrastructure
❑ HL + IX process plant
❑ Ramp up
❑ U3O8 production
Production
❑
3.5
Expansion optionality
Mlbs p.a.
Mlbs p.a.
2024
2025
2026
2027
6.7
6.7
Mlbs p.a.
2028
2029
2030
13
Building the
organisation
➢ Reputation
➢ People
➢ Culture and systems
NuScale SMR
14
BUILDING THE ORGANISATION
Strong reputation built over 18 years
Mondesa
Youth
Opportunities
Environmental
baseline monitoring
since 2008
SRT
Conservancy
Tourism
Education
TOSCO
Hospitality
Association of
Namibia
Trade
scholarships
(NIMT)
Peer reviewed, IFC
compliant ESIA and
management plans
2023 African Mining Indaba
ESG Forum Award for
Community Engagement
Early
Learner
Assistance
Program
CTAN
Active
role
modelling
Rehabilitation
of Namib
desert
NCE
Chamber of
Mines
World best
practices
NUA
One
Economy
Foundation
World
Nuclear
Association
PeerReviewed
ESIA
15
BUILDING THE ORGANISATION
Skilled delivery team with deep Namibian expertise
Gavin Chamberlain | Chief Executive Officer
•
•
•
30+ years in project development/construction & contracting, currently based in Cape Town.
Former Regional Director, Mining for AMEC (now Wood plc) and COO of Kore Potash.
Project Director for construction of Husab uranium mine.
Brandon Munro | Executive Chairman
•
•
25+ years’ transactional and capital markets experience as a corporate lawyer and resources executive. Lived in Namibia for 5+ years.
Member of the World Nuclear Association Advisory Council, Strategic Advisor to Namibian Chamber of Mines and former Chair of WNA
Nuclear Fuel Demand Working Group.
Steve Herlihy | Chief Financial Officer
•
•
•
30+ years’ experience as chartered accountant in resources.
Previously global Financial Controller for BHP Iron Ore and member of BHP’s strategy and innovation leadership team.
Deep commercial, M&A, project finance experience.
Olga Skorlyakova | Vice President, Market Strategy
•
•
•
25+ years in BD, sales and market strategy in international business environments (UK, Europe, USA, Asia).
Executive roles within nuclear fuel sector over last 15 years including Areva (now Orano).
Co-author, editor, and head of publication of WNA’s “Nuclear Fuel Report: Global Scenarios for Demand and Supply Availability”.
Werner Ewald | Managing Director - Namibia
•
•
•
30+ years’ experience in uranium, diamond, coal mining.
Former Manager of Mining at Rössing Uranium prior to joining BMN, currently a member of the Namibian Chamber of Mines Council.
Namibian born Electrical Engineer based in Swakopmund.
Mike Leech | Director – Namibia, NED
•
•
•
30+ years’ mining industry experience, Rio Tinto. Currently based in Namibia.
Deep Namibian uranium operating experience including former roles as MD and CFO at Rössing Uranium.
Founding Chair, Namibian Uranium Association, former President of Namibian Chamber of Mines.
Project experience
Uranium experience
Corporate relations
Sustainability experience
Nuclear experience
Commercial & finance experience
16
BUILDING THE ORGANISATION
Our Values
These are the principles that guide our behaviour and decision-making processes
at Bannerman:
1. Proactive: "We get ready for what's coming. We quickly grab chances and solve
problems."
2. Reliable: "We work hard to be excellent and keep our promises to the people
we work with."
3. Respectful: "We listen to and respect what everyone has to say."
4. Integrity: "We are always honest and fair."
5. Diverse Thinking: "We look for many ideas to help us innovate and make smart
choices."
PROACTIVE
RELIABLE
RESPECTFUL
INTEGRITY
DIVERSE THINKING
17
BUILDING THE ORGANISATION
Building our culture from the beginning
PROACTIVE
RELIABLE
RESPECTFUL
INTEGRITY
DIVERSE THINKING
18
BUILDING A URANIUM PRODUCTION BUSINESS
Building stakeholder
(shareholder) value
Cost of production
Revenue
Project delivery
19
SHAREHOLDER CONTACT DETAILS
Brandon Munro
Executive Chairman
Email: info@bmnenergy.com
Gavin Chamberlain
Chief Executive Officer
Email: info@bmnenergy.com
Emma Culver
Communications Coordinator
Email: shareholders@bmnenergy.com
@BannermanEnergy
Bannerman Energy Ltd
www.bannermanenergy.com
20
Share your feedback
Discover