ASX ANNOUNCEMENT
29 May 2025
Investor Presentation
Bannerman Energy Ltd (ASX:BMN, OTCQX:BNNLF, NSX:BMN) (Bannerman or the Company) is
pleased to release a copy of an investor presentation to accompany meetings that coincide with the
World Nuclear Fuel Market Annual Meeting being held from 2 to 4 June 2025 in Sydney, Australia.
This ASX release was authorised on behalf of the Bannerman Board by:
Brandon Munro, Executive Chairman
Contact
Investors:
Media:
Brandon Munro
Executive Chairman
T: +61 8 9831 1436
info@bmnenergy.com
Michael Vaughan
Fivemark Partners
T: +61 422 602 720
michael.vaughan@fivemark.com.au
Important Notices
This announcement contains forward-looking statements which are identified by words such as ‘may’, ‘could’, ‘believes’, ‘estimates’,
‘targets’, ‘expects’, or ‘intends’ and other similar words that involve risks and uncertainties. These statements are based on an
assessment of present economic and operating conditions, and on a number of assumptions regarding future events and actions that,
as at the date of this announcement, are considered reasonable. Such forward-looking statements are not a guarantee of future
performance and involve known and unknown risks, uncertainties, assumptions, and other important factors, many of which are beyond
the control of the Company, the Directors, and the management. The Directors cannot and do not give any assurance that the results,
performance, or achievements expressed or implied by the forward-looking statements contained in this announcement will actually
occur and investors are cautioned not to place undue reliance on these forward-looking statements. The Directors have no intention
to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new
information, future events or any other factors affect the information contained in this announcement, except where required by law or
the ASX listing rules. The information contained in this announcement does not constitute investment or financial product advice (nor
taxation, accounting, or legal advice), is not a recommendation to acquire Bannerman shares and is not intended to be used or relied
upon as the basis for making an investment decision. This announcement has been prepared without taking into account the investment
objectives, financial situation or needs of any individuals. Before making any investment decisions, prospective investors should
consider the appropriateness of the information having regard to their own investment objectives, financial situation and needs and
should seek legal, accounting and taxation advice appropriate to their jurisdiction. Bannerman is not licensed to provide investment or
financial product advice in respect of Bannerman shares.
Bannerman Energy Ltd
Suite 7, 245 Churchill Avenue, Subiaco, Western Australia 6008
PO Box 1973, Subiaco, Western Australia 6008
Investor
Presentation
June 2025
ASX:BMN, OTCQX:BNNLF AND NSX:BMN
CAUTIONARY STATEMENT
Important notices
Of the Mineral Resources scheduled for extraction and recovery in the Etango-8 Definitive Feasibility Study (DFS) and Etango-XP / XT Scoping Study (Scoping Study), 100% are classified as Measured or Indicated.
Bannerman Energy Ltd (Bannerman, the Company) confirms that there are no Inferred Resources included in the Etango-8 DFS or Etango-XP / XT Scoping Study production schedules.
The Mineral Resources underpinning the Ore Reserve and production target in the Etango-8 DFS (and the production target in the Etango-XP / XT Scoping Study) have been prepared by a competent person in accordance
with the requirements of the JORC Code (2012). The Competent Person’s Statement is found overleaf. For full details of the Mineral Resource estimate, please refer to the ASX release dated 6 December 2022, “Etango-8
Definitive Feasibility Study”. Bannerman confirms that it is not aware of any new information or data that materially affects the Mineral Resource estimate included in that release. All material assumptions and technical
parameters underpinning the Mineral Resource estimate in that ASX release continue to apply and have not materially changed.
This release contains a series of forward-looking statements. Generally, the words "expect," “potential”, "intend," "estimate," "will" and similar expressions identify forward-looking statements. By their very nature forwardlooking statements are subject to known and unknown risks and uncertainties that may cause our actual results, performance or achievements, to differ materially from those expressed or implied in any of our forward-looking
statements, which are not guarantees of future performance. Statements in this release regarding Bannerman’s business or proposed business, which are not historical facts, are forward-looking statements that involve risks
and uncertainties, such as Mineral Resource estimates, Ore Reserve estimates, market prices of metals, capital and operating costs, changes in project parameters as plans continue to be evaluated, continued availability of
capital and financing and general economic, market or business conditions, and statements that describe Bannerman’s future plans, objectives or goals, including words to the effect that Bannerman or management expects
a stated condition or result to occur. Forward-looking statements are necessarily based on estimates and assumptions that, while considered reasonable by Bannerman, are inherently subject to significant technical,
business, economic, competitive, political and social uncertainties and contingencies. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties.
Actual results in each case could differ materially from those currently anticipated in such statements. Investors are cautioned not to place undue reliance on forward-looking statements, which speak only as of the date they
are made.
Bannerman has concluded that it has a reasonable basis for providing these forward-looking statements and the forecast information included in this ASX release. This includes a reasonable basis to expect that it will be able
to fund the development of Etango upon successful delivery of key development milestones as and when required. The detailed reasons for these conclusions are outlined in the ASX release dated 6 December 2022,
“Etango-8 Definitive Feasibility Study”, in the section titled, “Funding pathway”. While Bannerman considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be
correct or that the range of outcomes indicated by the DFS will be achieved.
To achieve the range of outcomes indicated in the DFS, pre-production funding in excess of US$353M will likely be required. There is no certainty that Bannerman will be able to source that amount of funding when required.
It is also possible that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Bannerman’s shares. It is also possible that Bannerman could pursue other value realisation
strategies such as a sale, partial sale or joint venture of the Etango Project. These could materially reduce Bannerman’s proportionate ownership of the Etango Project.
For full details of the Etango-8 DFS and Etango-XP / XT Scoping Study, please refer to ASX releases dated 6 December 2022, “Etango-8 Definitive-Feasibility Study” and 18 March 2024, “Etango-XP and Etango-XT Scoping
Study”. In addition, please refer to ASX release dated 11 June 2024, “Etango-8 FEED Complete and Costs Updated; Detailed Design Commenced”. Other than the updated capital and operating costs expressed in the 11
June 2024 release, Bannerman confirms that it is not aware of any new information or data that materially affects the information included in the releases of 6 December 2022 and 18 March 2024. All material assumptions
and technical parameters underpinning the estimates in those ASX releases continue to apply and have not materially changed.
2
FORWARD LOOKING AND COMPETENT PERSON STATEMENTS
Important notices
Forward Looking Statements
Competent Person Statement
This presentation includes various forward looking statements which are identified by the use of forward looking words such as
“may”, “could”, “will”, “expect”, “believes”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar
words and may include, without limitation statements regarding plans, strategies and objectives of management, anticipated
production or construction commencement dates and expected costs or production outputs. Statements other than statements of
historical fact may be forward looking statements. Bannerman believes that it has reasonable grounds for making all statements
relating to future matters attributed to it in this presentation.
The information in this release relating to the Mineral Resources and Ore Reserves was reported in accordance with the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and the
ASX Listing Rules in a release to the ASX dated 6 December 2022 titled “Etango-8 Definitive Feasibility Study”.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of
resources or reserves, political and social risks, changes to the regulatory framework within which the Company operates or may
in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel,
industrial relations issues and litigation. Investors should note that any reference to past performance is not intended to be, nor
should it be, relied upon as a guide to any future performance.
The Competent Person responsible for the reporting of the Ore Reserves in the release of 6 December 2022 is by Mr Werner K
Moeller, a Member of The Australasian Institute of Mining and Metallurgy, a Member of the South African Institute of Mining and
Metallurgy and a Member of the Canadian Institute of Mining, Metallurgy and Petroleum.
The Competent Person responsible for the reporting of the Mineral Resources in the release of 6 December 2022 is Mr Ian
Glacken, a Fellow of the Australasian Institute of Mining and Metallurgy.
Other than the additional information presented in its ASX release dated 11 June 2024 titled “Etango Feed Complete, Costs
Updated, Detailed Design”, Bannerman confirms that it is not aware of any new information or data that materially affects the
information included in the release of 6 December 2022, that all material assumptions and technical parameters underpinning the
estimates in that release continue to apply and have not materially changed, and that the form and context in which the Competent
Persons’ findings are presented have not been materially modified.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the future.
The Company does not give any assurance that the assumptions on which forward looking statements are based will prove to be
correct, or that the Company’s business or operations will not be affected in any material manner by these or other factors not
foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts to identify factors that would cause actual actions, events or results to differ materially from those
disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or
events not to be anticipated, estimated or intended, and many events are beyond the reasonable control of the Company.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Actual results, values, performance
or achievements may differ materially from results, values, performance or achievements expressed or implied in any forward
looking statement. None of Bannerman, its officers or any of its advisors make any representation or warranty (express or implied)
as to the accuracy or likelihood of fulfilment of any forward looking statement, or any results, values, performance or achievements
expressed or implied in any forward looking statement except to the extent required by law.
Forward looking statements in this release are given as at the date of issue only. Subject to any continuing obligations under
applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake any
obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or
circumstances on which any such statement is based.
3
ABOUT BANNERMAN ENERGY
The leading next- generation
uranium supplier of choice
Our flagship Etango Project is one of the world’s largest,
most advanced uranium development assets.
Scale and scalability initial production of 3.5Mlbs pa,
expandable to 6.7Mlbs pa, from 225Mlbs U3O8 Resource*
Benefiting from its location in Namibia, a highly
established uranium production powerhouse.
Strongly de-risked through extensive drilling, technical
evaluation and process demonstration plant.
Fully permitted with a clear pathway to development.
Readily positioned to capitalise on the unfolding uranium
market recovery.
* See Appendix for full resources and reserves statement
Water storage facilities on site will provide 10 days’ storage capacity, significantly mitigating the risk of any potential disruptions.
4
ABOUT BANNERMAN ENERGY
Corporate snapshot
CAPITAL STRUCTURE
SHARE PRICE (ASX: BMN)
A$2.92
A$5.00
A$1.75 – A$4.62
A$4.00
Shares on issue
178.8 M
A$3.00
Market capitalisation
A$522 M
A$2.00
Options and performance rights
4.4 M
A$1.00
Average daily volume: shares (ASX 3-month)
1.0 M
ASX share price (27 May 2025)
12 month share price range
Cash (31 Mar 2025)
Debt
EQUITY ANALYST COVERAGE
A$68.8 M
Zero
A$0.00
May 24
Jul 24
Sep 24
Nov 24
Jan 25
Mar 25
May 25
SUBSTANTIAL SHAREHOLDERS (%)
MM Asset Management (11.8%)
Sprott Asset Management (11.1%)
Paradice (8.2%)
Global X (5.7%)
Other Insitutional (7.3%)
Board & Management (2.5%)
HNW and Retail (53.4%)
5
INVESTMENT HIGHLIGHTS
The leading greenfield uranium proponent
1
Social licence to operate in Namibia
2
Fully permitted
3
Proven team with deep uranium experience
4
Strong technical and commercial viability
5
Further in-ground leverage
6
Heavily de-risked & readily positioned
7
Long track record of responsibility and sustainability
8
Phased greenlight approach maximises flexibility
On-site construction power infrastructure is complete and connection to the grid established.
6
INVESTMENT HIGHLIGHTS
1. Licence to operate in Namibia, a
stable, highly established uranium
jurisdiction
Recognised tier-one supplier to global utilities
Rossing
45-years of uranium production and export
Husab
Etango
Three large-scale uranium mines; Top 3 global producer
Langer Heinrich
Tumas
(Deep Yellow)
Excellent infrastructure - port, rail and power
Clear mining code and strong rule of law
Strong community and social support for uranium
7
INVESTMENT HIGHLIGHTS
2. Fully permitted with all environmental
approvals and Mining Licence in place to
build, operate and expand Etango Mine
Environmental licence
CONSENT TYPE
DATE ACHIEVED
ECC 01608 (Etango Project)
5 July 2012
ECC 02193 (linear infrastructure)
26 July 2011
ECC 01529 (HL demonstration plant)
7 September 2014
ECC APP 3078 (permanent water pipeline)
10 August 2022
ECC APP 3058 (electrical transmission line)
23 August 2022
ECC 2300287 (temporary water pipeline)
16 April 2023
Etango Mining Licence awarded December 2023
8
INVESTMENT HIGHLIGHTS
3. Experienced Board of Directors with extensive uranium
operating & development experience
Brandon Munro | Executive Chairman
Felicity Gooding | Non-Executive Director
•
•
•
25+ years’ transactional and capital markets experience as a corporate lawyer and
resources executive. Lived in Namibia for 5+ years
Member of the World Nuclear Association Advisory Council, Strategic Advisor to
Namibian Chamber of Mines and former Chair of WNA Nuclear Fuel Demand
Working Group
•
•
20 years’ experience in senior finance and management roles within multinational
and ASX-listed organisations
ED & Group CFO of Lithium and Geothermal Energy developer, Vulcan Energy
Resources
Former CFO & Global Head of Commercial at Fortescue Future Industries (FFI), a
subsidiary of Fortescue Limited
Alison Terry | Lead Independent Non-Executive Director
•
•
30+ years’ experience in sustainability, ESG dynamics, legal & corporate affairs
and operations
Former Director Sustainability & Corporate Affairs at Fortescue Limited
Clive Jones | Non-Executive Director
•
•
30+ years in mineral exploration and founding/developing/transacting ASX
companies
One of the original vendors of the Etango project
Twapewa Kadhikwa | Chairperson – Namibia
•
•
Mike Leech | Director – Namibia
•
•
•
Bruce McFadzean | Non-Executive Director
•
•
•
40+ years mining and process experience as a mining engineer
30 years’ exposure to all levels of construction and operations, ranging in size from
BHP and Rio Tinto to junior development companies
15 years as CEO of companies constructing and operating mines in Australia and
Africa
High-profile Namibian businesswoman and company director
Respected SME advisor to government
30+ years’ mining industry experience. Currently based in Namibia.
Deep Namibian uranium operating experience including former roles as MD and
CFO at Rössing Uranium.
Founding Chair, Namibian Uranium Association, former President of Namibian
Chamber of Mines
Danny Goeman | Independent Chair, Product Offtake Committee
•
•
•
30+ years experience in commodity marketing
Track record spanning a range of leading mining organisations, commodities &
regions
Executive roles with Rio Tinto & Fortescue Limited with extensive experience in
Asia and Europe
9
INVESTMENT HIGHLIGHTS
3. Proven management team with deep in-country and
uranium operating experience
Gavin Chamberlain | Chief Executive Officer
•
•
•
30+ years in project development/construction & contracting
Former Regional Director, Mining for AMEC (now Wood plc) and COO of Kore Potash
Project Director for construction of Husab uranium mine
Werner Ewald | Managing Director - Namibia
•
•
•
30+ years' experience in the uranium, diamond and coal mining industries
Previously was the Mine Manager at the Rössing uranium mine (Namibia)
Namibian born & based in Swakopmund
Melvin Yeo | Chief Legal Counsel
•
•
•
25+ years’ experience in various legal roles
Previous senior roles at Wesfarmers Limited & Corrs Chambers Westgarth
Extensive transactional and operating experience around the world, including Namibia
Jeff Pipe | Owner’s Team Project Manager
•
•
•
40+ years of project & construction management experience in Africa
Worked in coal, gold, platinum & diamond mining (both surface & underground works)
Managing director of Archway Projects for 20 years
Steve Herlihy | Chief Financial Officer & Joint Company Secretary
•
•
•
30+ years’ experience as a chartered accountant
Previous experience at BHP Iron Ore as global Financial Controller & Special Projects
Deep M&A and project finance experience
Cindy Fraser | Owner’s Team Commercial Manager
•
•
Olga Skorlyakova | Vice President, Market Strategy
•
•
•
25+ years’ experience in international business development, sales & market strategy
Held executive roles within the nuclear fuel sector with AREVA (now Orano) & TENEX
Recently led the WNA Fuel Report Working Group
Andre Alberts | Owner’s Team Technical Manager
•
•
•
Matt Horgan | Vice President, Corporate Development
•
•
•
14 years’ experience working across technical, marketing, commercial, Investor
relations, project development & corporate development/M&A.
Recent and direct experience in African domiciled mineral assets
Held executive & senior roles at Peak Rare Earths, Azure Capital & Alcoa
30 years’ experience in commercial, contract & supply chain areas of major mining
projects, including in Southern Africa
Vast knowledge of developing & implementing project systems & procedures, along
with contract management, procurement & logistics experience
13+ years’ experience in the mining industry, with an operational background in
hydrometallurgy
Leading the team of engineers for owner engineering services
Previously worked at Skorpion zinc refinery & Tschudi copper mine/heap leach
Karen Logan | Joint Company Secretary
•
•
Chartered Secretary with 20+ years of governance & regulatory compliance
experience with private & ASX-listed companies based in Australia & overseas
Extensive corporate experience in the resources sector
10
INVESTMENT HIGHLIGHTS
4. Strong technical and
commercial viability
demonstrated via
Etango-8 DFS
• Conventional open pit mining and heap leach
processing at 8Mtpa throughput
• Informed by vast body of previous technical
work across resource drilling, geotechnical,
metallurgical and environmental studies
• Cost estimates completed to +/-10% accuracy
and current as at June 2024
15 years
113.5 Mt
Initial mine life
Total ore throughput
8 Mtpa
240 ppm
Throughput capacity
Average U3O8 head grade
87.8%
3.5 Mlb
Processing yield
Average U3O8 output p.a.
US$35.8/lb
US$353M
Cash opex excl royalties1
Pre-production capex1
For full details of the Etango-8 DFS, please refer to ASX release dated 6 December 2022, “Etango-8 Definitive-Feasibility Study”. In addition, please refer to ASX release dated 11 June 2024,
“Etango-8 FEED Complete and Costs Updated; Detailed Design Commenced”. Other than the updated capital and operating costs expressed in the 11 June 2024 release, Bannerman confirms
that it is not aware of any new information or data that materially affects the information included in the 6 December 2022 release. All material assumptions and technical parameters underpinning
the estimates in the 6 December 2022 release continue to apply and have not materially changed.
11
Note: 1 Reflective of the updated cost estimates from the Control Budget Estimate contained in the ASX release dated 11 June 2024, “Etango-8 FEED Complete and Costs Updated; Detailed
Design Commenced”.
INVESTMENT HIGHLIGHTS
4. Outstanding Etango-8 upside price leverage
Incorporating completion of the Front-End Engineering and Design (FEED) and Control Budget Estimate (CBE) processes1
Net cashflow (post-tax)
4,500
Post-tax NPV (8%)
800
43%
2,537
US$mm
3,000
US$mm
614
141%
76%
1,774
1,500
57%
390
400
162
1,010
-
US$65/lb
US$80/lb
US$65/lb
US$95/lb
Payback (post-tax)
6
US$95/lb
Post-tax IRR
45%
(23%)
27%
(21%)
50%
4
3.3
2.6
IRR %
4.3
Years
US$80/lb
30%
26.7%
21.1%
14.1%
15%
2
-
US$65/lb
US$80/lb
US$95/lb
US$65/lb
US$80/lb
US$95/lb
For full details of the Etango-8 DFS, please refer to ASX release dated 6 December 2022, “Etango-8 Definitive-Feasibility Study”. In addition, please refer to ASX release dated 11 June 2024,
“Etango-8 FEED Complete and Costs Updated; Detailed Design Commenced”. Other than the updated capital and operating costs expressed in the 11 June 2024 release, Bannerman confirms
that it is not aware of any new information or data that materially affects the information included in the 6 December 2022 release. All material assumptions and technical parameters underpinning
the estimates in the 6 December 2022 release continue to apply and have not materially changed.
12
Note: 1 Reflective of the updated cost estimates from the Control Budget Estimate contained in the ASX release dated 11 June 2024, “Etango-8 FEED Complete and Costs Updated; Detailed
Design Commenced”.
INVESTMENT HIGHLIGHTS
5. Further in-ground
leverage realisable via
subsequent growth options
Etango can deliver substantially higher value
scalability post ramp-up with higher uranium
price outcomes, market conditions permitting
Etango-XP: Mine and plant throughput
expanded to 16 Mtpa (expansion capital
US$367M1)
ETANGO-XP
ETANGO-XT
(EXPANDED SCALE)
(EXTENDED LIFE)
Average 6.7 Mlbs U3O8
output pa (post exp.)
Average 3.5 Mlbs U3O8
output pa
16 years
27 years
Mine life
Mine life
LOM U3O8 output
Etango-XT: Life extension with mine and
plant throughput maintained at 8 Mtpa
95.2Mlbs
For full details of the Etango-XP and Etango-XT Scoping Study, please refer to ASX release dated 18 March 2024, “Etango-XP and Etango-XT Scoping Study”. In addition, please refer to ASX
release dated 11 June 2024, “Etango-8 FEED Complete and Costs Updated; Detailed Design Commenced”. Other than the updated capital and operating costs expressed in the 11 June 2024
release, Bannerman confirms that it is not aware of any new information or data that materially affects the information included in the 18 March 2024 release. All material assumptions and
technical parameters underpinning the estimates in the 18 March 2024 release continue to apply and have not materially changed.
Note: 1 Reflective of the updated cost estimates from the Control Budget Estimate contained in the ASX release dated 11 June 2024, “Etango-8 FEED Complete and Costs Updated; Detailed
Design Commenced”.
INVESTMENT HIGHLIGHTS
5. Further upside price leverage from Etango-XP / XT
Incorporating completion of the Front-End Engineering and Design (FEED) and Control Budget Estimate (CBE) processes1
Net cashflow (post-tax)
68%
29.5%
30%
IRR %
US$mm
30%
905
800
1,317
Post-tax IRR
45%
66%
211%
2,698
2,000
Post-tax NPV (8%)
4,079
4,000
544
400
22.7%
15%
13.5%
175
-
-
6,000
US$80/lb
US$95/lb
Net cashflow (post-tax)
1,200
49%
96%
1,442
US$65/lb
US$80/lb
US$95/lb
Post-tax IRR
45%
27%
51%
146%
767
800
2,823
US$95/lb
58%
US$mm
US$mm
US$80/lb
Post-tax NPV (8%)
4,205
4,000
2,000
US$65/lb
484
400
30.0%
30%
23.7%
IRR %
US$65/lb
Etango-XT
1,200
51%
105%
US$mm
Etango-XP
6,000
15.7%
15%
197
-
US$65/lb
US$80/lb
US$95/lb
US$65/lb
US$80/lb
US$95/lb
US$65/lb
US$80/lb
US$95/lb
For full details of the Etango-XP and Etango-XT Scoping Study, please refer to ASX release dated 18 March 2024, “Etango-XP and Etango-XT Scoping Study”. In addition, please refer to ASX
release dated 11 June 2024, “Etango-8 FEED Complete and Costs Updated; Detailed Design Commenced”. Other than the updated capital and operating costs expressed in the 11 June 2024
release, Bannerman confirms that it is not aware of any new information or data that materially affects the information included in the 18 March 2024 release. All material assumptions and
technical parameters underpinning the estimates in the 18 March 2024 release continue to apply and have not materially changed.
Note: 1 Reflective of the updated cost estimates from the Control Budget Estimate contained in the ASX release dated 11 June 2024, “Etango-8 FEED Complete and Costs Updated; Detailed
Design Commenced”.
14
INVESTMENT HIGHLIGHTS
6. Heavily de-risked & readily
positioned to capitalise on the
unfolding uranium market recovery
Strong balance sheet with robust cash balance
Staged greenlight approach to project
development ensures maximum flexibility
Strongly derisked, technically and financially
Simple conventional flow sheet, tested through
demonstration plant
Early works construction underway
The Etango Heap Leach Demonstration Plant has been operational since 2018.
15
INVESTMENT HIGHLIGHTS
7. Long track record of
responsibility and sustainability
Achieved 15 years of zero lost-time injuries
IFC compliant ESIA and management
plans,15+ year environmental baseline
Award-winning community programs and
sustainability framework delivering lasting impact
through targeted initiatives
Creation of 760 direct and 5,000+ indirect jobs
Taxes and royalties will make material
contribution to Namibian economy
Bannerman’s Early Learner Assistance Program has run successfully for 14 years.
16
ETANGO DEVELOPMENT
8. Phased greenlight approach to
Etango development
Etango early works construction activities
tracking in line with budget and schedule
Detailed design works progressing
Current contracts in progress at Etango:
Bulk earthworks, internal access roads and
construction power (running ahead of schedule)
Finance and offtake workstreams progressing in
parallel
Phased approach maintains maximum flexibility
ahead of FID
17
PROXIMATE, LOW RISK, LONG TERM, EXPANDABLE, SOCIALLY RESPONSIBLE
Roadmap to production
Financing phase
Development phase
❑ Initial offtake
agreements
Contracting
Etango Development
❑ Build / optimise
contract portfolio
Expansion phase
❑ Strategic / project
financing
❑ FID targeted during 2025
Financing
✓ FEED/CBE
Mining licence
granted
Construction
✓ Site access
road
✓ Temp water
❑ Temp power
❑ Mine and infrastructure
❑ HL + IX process plant
❑
❑
Production
Expansion
Commissioning and ramp up
Full U3O8 production
3.5
❑
FID potential expansion
Mlbs p.a.
Mlbs p.a.
2024
2025
2026
2027
2028
6.7
2029
2030
18
ETANGO SITE PROGRESS
Primary crusher site fully excavated
The primary crusher has been fully excavated, while work advances on the permanent road and conveyor
belt line to the se