Corporate Presentation
Released
Released
Announcement PDF
The enhanced Etango
An advanced, world class uranium project
11 November 2015
Technical disclosures and forward looking disclaimers
Certain disclosures in this release, including management's assessment of Bannerman’s plans and projects, constitute forward looking statements that are subject to
numerous risks, uncertainties and other factors relating to Bannerman’s operation as a mineral development company that may cause future results to differ materially from
those expressed or implied in such forward-looking statements. The following are important factors that could cause Bannerman’s actual results to differ materially from
those expressed or implied by such forward looking statements: fluctuations in uranium prices and currency exchange rates; uncertainties relating to interpretation of drill
results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated
economic return; general market conditions; the uncertainty of future profitability; and the uncertainty of access to additional capital. Full descriptions of these risks can be
found in Bannerman’s various statutory reports, including its Annual Information Form available on the SEDAR website, sedar.com. Readers are cautioned not to place undue
reliance on forward-looking statements. Bannerman expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of
new information, future events or otherwise.
Mineral Resources which are not Ore Reserves do not have demonstrated economic viability.
Competent person’s statement
The information in this release relating to the Mineral Resources of the Etango Project (November 2015) is based on a resource estimate compiled or reviewed by Mr Ian
Glacken, Principal Consultant at Optiro Pty Ltd and a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Glacken has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”, is an independent consultant to Bannerman and a Qualified Person as
defined by Canadian National Instrument 43-101. Mr Glacken consents, and provides corporate consent for Optiro Pty Ltd, to the inclusion in this release of the matters
based on his information in the form and context in which it appears.
The information in this release relating to the Mineral Resources (October 2010) of the Etango Project is based on a resource estimate compiled or reviewed by Mr Brian
Wolfe in April 2012. Mr Wolfe is a Member of the Australian Institute of Geoscientists. Mr Wolfe was employed by Coffey Mining as an independent consultant to the
Company at the time of the studies and public release of results. As Mr Wolfe is now no longer employed by Coffey Mining, Coffey Mining has reviewed this presentation and
consent to the inclusion, form and context of the relevant information herein as derived from the original reports for which Mr Wolfe’s consent has previously been given. Mr
Wolfe has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which is being undertaken to qualify as a
Competent Person as defined in the 2004 Edition of the JORC ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ and a Qualified
Person as defined by Canadian National Instrument 43-101.
The information in this release relating to the Ore Reserves (April 2012 and November 2015) of the Etango Project is based on information compiled or reviewed by Mr Leon
Fouché, a full time employee of Bannerman Resources Limited. Mr Fouché is a Fellow of The Australasian Institute of Mining and Metallurgy and has sufficient experience
relevant to the style of mineralisation and types of deposits under consideration and to the activity which is being undertaken to qualify as a Competent Person as defined in
the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”, and a Qualified Person as defined by Canadian National
Instrument 43-101. Mr Fouche consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.
2
The newly optimised Etango is a rare beast
Strongly enhanced investment
proposition
Etango is a rarity: a development-ready
uranium project with world class scale
and simplicity
DFS Optimisation Study – sharply improved project
economics and forecast returns
Completed DFS, environmental permit granted and a
readily identifiable pathway to a mining licence
Further technical advancement – heap leach
process route proven via demonstration plant
Established logistics chains in a stable and supportive
country with long uranium mining history
Project consolidation (now 100% BMN) and BMN
capital structure clean-up (no bank debt)*
M&I Resource of 165 Mlb contained U3O8 and
forecast production of 7.2 Mlb U3O8 per annum
Optimised project economics
demonstrate robust financial returns
A highly, and relevantly, experienced
team driving the project forward
Significantly reduced strip ratio (-17%) and LOM
mining cost (-14%) estimates
Major project construction and extensive Namibian
uranium operating experience
Competitive capital intensity of US$110 per pound
annual U3O8 production and rapid payback (4 years)
Strong mix of technical and corporate abilities
US$419M Etango project NPV8% and 15% post-tax
IRR at US$75/lb U3O8
Progressing Etango to targeted investment decision
by end 2016
* Pending shareholder approval of the recently announced transactions with Resource Capital Funds and minority project interest
purchase
3
Key Etango and corporate milestones
Flagship Etango uranium project in Namibia acquired in 2005 (80% interest)
–
Over US$60M invested to date in drilling and advanced feasibility/demonstration work
–
Confirms Etango as a simple, large-scale, long life development project of global significance
Depressed uranium market post Fukushima (2011) has seen focus on de-risking and optimising Etango
–
Definitive Feasibility Study (DFS) completed April 2012
–
Heap leach process proven by successful construction and operation of demonstration plant (October 2014 – present)
–
DFS Optimisation Study (November 2015) delivers significant reductions in opex and sustaining capital = enhanced returns
Asset ownership consolidation and balance sheet clean-up
–
Acquiring 20% minority holding in Etango for 123.4M Bannerman shares and A$1M cash*
–
Clearing convertible notes (A$12M) and A$5M cash raised via part note conversion, 1.5% royalty issue and share placement*
Etango exploration project
acquisition (80%)
Initial
Scoping
resource study
estimate completed
2005
2007
2006
BMN listed on ASX
2008
BMN listed
on TSX
NI 43-101 on
Etango resource
2009
BMN listed
on NSX
2010
PFS completed
Updated NI 43101 on Etango DFS completed
2011
2012
2013
Etango environmental
approval granted
* Pending shareholder approval of the recently announced transactions with Resource Capital Funds and minority project interest purchase
4
Heap leach demo DFS Op Study
plant construction completed
2014
2015
Minority project interest
acquired and BMN balance
sheet refreshed
Bannerman corporate snapshot
Capital structure*
ASX / TSX / NSX ticker
ASX share price (9 November 2015)
Share register*
BMN / BAN / BMN
A$0.041
12 month share price range
A$0.030 - 0.082
Pro forma shares on issue
710.3 million
Pro forma market capitalisation
A$29M
Options and performance rights
30.0 million
Average daily volume (ASX)
0.22 million
Pro forma cash
A$5M
Pro forma debt
A$0M
Board and key management
Ronnie Beevor (Non-Executive Chairman)
30+ years investment banking experience and formerly a director of successful gold-copper developer, Oxiana Ltd.
Len Jubber (CEO and Managing Director)
Previously MD/CEO of Perilya (2005-08); 7 years with OceanaGold (COO/ED); 8 years in southern Africa at Rössing Uranium.
Clive Jones (Non Executive Director)
Geologist with more than 20 years in mineral exploration; one of the original vendors of the Etango project to BMN.
David Tucker (Non Executive Director)
40+ years experience in mining and exploration, particularly uranium geology; lengthy tenure at Homestake/Barrick.
Ian Burvill (Non Executive Director)
Senior VP with Resource Capital Funds; over 25 years of mining industry experience starting as a process plant engineer.
Werner Ewald (General Manager – Namibia)
25+ years experience in diamond, coal and uranium mining; prior to joining BMN was Manager Mining at Rössing Uranium.
Leon Fouché (Study Manager)
Namibian-born mining engineer with 25 years industry experience, 12 years at Rössing Uranium (incl. Manager Mining).
Robert Dalton (Company Secretary)
Over 13 years experience in accounting and company secretarial roles; previously CFO and CoSec at Tangiers Petroleum
John Turney (Project Adviser – Etango)
35+ years in major mining/engineering companies; led development of Cowal gold mine (Australia) and Tulawaka gold (Tanzania).
* Capital structure and share register details are on a pro forma basis and assume shareholder approval of the recently announced
financing transactions with Resource Capital Funds and minority project interest purchase
5
Chinese fuelled uranium demand
World electricity consumption
Shifting dynamics of uranium demand are clear
–
–
Current nuclear reactor fleet is dominated by OECD
capacity (>80%)
However, 75% of capacity under construction today is
domiciled in non-OECD countries
TWh
35,000
OECD
Non-OECD
30,000
25,000
20,000
15,000
10,000
China emissions targets centred around ‘peak
emissions’ in 2030; with an increase in non fossil fuel
contribution to ~20% of the energy mix (2013: 10%)
–
Estimated 31GW under construction (end 2014)
–
With a further 30GW capacity targeted to be under
construction at end of 2020
–
0
1980
1990
2012
2035e
Source: World Energy Outlook 2014, OECD/IEA; Cameco
Chinese government stated target of 58GW nuclear
generating capacity by 2020 (2014: 19GW)
–
–
5,000
U consumption growth of 4% pa to 2024
M lbs
250
Consumption
Existing production
200
Chinese NDRC study completed in September 2015
confirmed viability of 31 reactors to support targets
150
UN Climate Change conference in December 2015
looms as the next key information point
100
50
0
2009
Source: Cameco
6
2010
2011
2012
2013
2014E
2015E
2024E
Uranium supply is at the crossroads
Kazakh production underperformance
Current U mine supply base will not support
future demand from operating and under
construction reactors
Prevailing term and spot price levels do not
incentivise investment in new capacity
–
–
UxC foreca st
Kazatomprom forecast (2010)
80
Actual production
70
60
50
40
Raft of project postponements and cessation of
projects under construction such as Immouraren
30
Kazakhstan production growth is expected to
moderate significantly
10
Closure of operations commissioned in recent
years outside of Kazakhstan (eg Trekkopje,
Kayelekera) highlights the challenges inherent in
taking projected mine supply growth through to
sustainable production
Recent commentary from industry leader Cameco
suggests a supply gap of ~90 mlbs pa by 2024
–
M lbs U3 O8
90
20
0
2011
2013
2014
2020e
Global uranium projects incentive pricing curve
This represents the requirement for 12 new mines
based on the average production size of the 10
largest operating uranium mines in 2014
Source: RBC Capital Markets
7
2012
Source: Cameco
Current uranium marketing trends
Current low levels of long term contracting are a
function of a market presently in surplus
Constant
US$/lb U3 O8
Long-term
Spot
250
100
Spot price*
Japanese shutdowns
200
80
–
Strong growth in Kazakhstan production
150
60
–
Cigar Lake commissioning
100
40
Approximately 50% of projected 2020 uranium
demand remains uncovered
Historically utilities come to contract market 3-5 years
ahead of uncovered requirements
Current price levels insufficient to incentivise
adequate project development in order to meet
future demand forecasts
–
Chinese reactor build in-line with stated plans
–
Secondary supplies dwindling
–
No new significant projects in pipeline, other than Cigar
Lake (commenced in 2005) and Husab
50
20
HEAVY CONTRACTING
0
0
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Oct
* Industry average price (UxC and TradeTech)
Source: UxC, Cameco
Future contracting: annual global uncovered requirements
Mlbs U3 O8
200
175
150
125
100
75
50
25
Source: UxC, Cameco
2025E
2024E
2023E
2022E
2021E
2020E
2019E
2018E
2017E
2016E
2015E
2014
0
8
120
–
–
Uranium volumes contracted
Mlbs U3 O8
300
Etango is a Tier 1 uranium asset
Key project parameters
DFS Opt Study
(November 2015)
DFS
(April 2012)
M&I Resources (U3O8)
395Mt at 189ppm
336Mt at 201ppm
–
M&I Resource of 165mlb U3O8
Mineral Reserves (U3O8)
303Mt at 195ppm
280Mt at 194ppm
–
Production of 7.2mlb pa over an initial 16 year life
303Mt
280Mt
2.8
3.3
20Mtpa
20Mtpa
Feed grade (first 5 full production years)
241
207
Feed grade (LOM)
195
194
Metallurgical recovery
87%
87%
Total production (U3O8)
113mlb
104mlb
Production (U3O8 LOM avg)
7.2mlb pa
6.9mlb pa
Initial mine life
15.7 years
15.0 years
Cash cost (first 5 years)
US$33/lb
US$41/lb
Cash cost (LOM)
US$38/lb
US$46/lb
Pre-production capital
US$793M
US$870M
Sustaining capital
US$282M
US$381M
US$110/lb/pa
US$126/lb/pa
15%
9%
Payback period
4.4 years
6.0 years
NPV8%
US$419M
US$69M
Total mined ore
Strip ratio
Plant throughput
Pre-production capital intensity
* DFS Optimisation Study forecast financial returns incorporate the 1.5% gross revenue royalty over Etango
held by Resource Capital Funds; the issuance of which is still pending Bannerman shareholder approval.
9
Located in Namibia; a low risk, long established and
highly supportive uranium mining jurisdiction
Environmental permit granted
Key outcomes from DFS Optimisation Study
–
Remodelled resource base
–
Lower strip ratio and bulk mining method
180t treated to date through demonstration plant
delivers credibility of the heap leaching flowsheet
–
At US$75/lb U3O8 price*
Project IRR (post-tax)
World class scale
Upside potential not included in DFS Optimisation Study
Competitive and robust economics versus other
uranium development projects globally
–
Development capital intensity of US$110/lb pa capacity
–
LOM operating costs US$38/lb; first 5 years at US$33/lb
–
15% IRR post-tax and US$419M project NPV8%
–
Rapid payback (4.4 years) and reserve mine life to
payback period ratio of 3.6x
World class scale and advanced progression
EARLY STAGE OR
CONCEPTUAL STUDY
DETAILED FEASIBILITY
WORK COMPLETE
OMAHOLA
(ASX: DYL)
LETLHAKANE
(ASX: ACB)
MULGA
ROCK
(ASX: VMY)
SALAMANCA
(ASX: BKY)
YELEERIE
(TSX: CCO)
NORASA
(TSX: FSY)
TRIPLE R
(TSX: FCU)
Scoping study/PEA
equivalent
completed
KINTYRE
(TSX: CCO)
PFS equivalent
completed
Exchange listed, pre-construction projects above 2mlb U3O8 pa forecast production.
Bubble area size indexed to forecast annual production volume.
Source: Various company data
10
ETANGO
(ASX: BMN)
WILUNA
(ASX:
TOE)
JORC/43-101 DFS
equivalent completed
Economic integrity only comes with the detail
Few uranium development projects currently have a completed Definitive Feasibility Study (DFS) – Etango does
History of uranium project assessment is one of significant cost estimate escalation with progression through
more detailed study phases
Forecast uranium project returns pre-DFS are, on average, highly unreliable and typically overstated
Average CAPITAL COST escalation for U projects globally
Index
Scoping study
Escalation (SS to PFS)
Escalation (PFS to DFS)
Average OPERATING COST escalation for U projects globally
Index
2.50
2.50
2.00
2.00
1.50
1.50
1.00
1.00
0.50
0.50
Scoping study
Escalation (SS to PFS)
0.00
0.00
Scoping study
Pre feasibility study
Definitive feasibility study
Scoping study
Pre feasibility study
Values represent average indexed escalation factors for a broad basket of uranium development projects globally over the past 15 years.
11
Escalation (PFS to DFS)
Definitive feasibility study
Namibia is a first class mining jurisdiction
Namibia is a well regarded mining jurisdiction;
particularly for uranium (5th largest producer)
–
12
Ranked most attractive African investment jurisdiction in
Fraser Institute Mining Company Survey
Effective uranium permitting and regulatory process
with a strong track record
–
3 new uranium mines permitted and constructed over the
past 10 years
–
Rössing uranium mine has operated for 40 years
Uranium export rated port at Walvis Bay; located 47km
from the Etango project
Stable government and fiscal regime
–
Recent Presidential election (November 2014)
–
37.5% mining corporate tax and 3% royalty
Established infrastructure chains support project
development and operations
–
Rössing and Langer Heinrich operating uranium mines
–
Husab uranium mine currently under construction
–
B2 Gold recently commissioned Otijikoto gold mine
–
Sulphuric acid plant investment (Dundee Precious Metals)
Etango geology
Simple geometry
6km strike length and up to 1km wide; extends to a
known depth of approx 400m
–
Outcrops at surface in the north, small cover (5-20m)
in the south
–
Dips at 15-40°
Simple geology
Stacked sequence of leucogranite (Alaskites)
intrusions of varying thickness
–
Rössing style mineralisation; no carbonates or high
acid consuming rock types
Orebody defined by extensive drilling
–
255km drilling; 29 dedicated geotechnical holes and
28 dedicated metallurgical holes
Simple mineralogy
Uraninite the dominant mineral; low acid
consuming rock types
Simple growth
Satellite deposits: Hyena, Ondjamba, Ompo
13
The optimised Etango resource
DFS
DFS OK
Model
25m
25m
75ppm wireframes
10m
75 trucks of the same
grade 201ppm
16.5 kt @ 201ppm
cut-off grade of 100 ppm
Mt
U3O8
Mlbs
Measured
63
205
28
Indicated
273
200
120
Inferred
46
202
20
Total
381
201
169
Ordinary Kriged
60 trucks some
below cut-off
Optimisation Study
25m
25m
50 ppm grade shells
8m
13.2 kt @ 201ppm
Ordinary Kriged
Mean grade
220 ppm
cut-off grade of 100ppm
Uniform Conditioning
OS UC
Model
Mt
U3O8
Mlbs
Measured
28
219
13
Indicated
286
217
137
Inferred
115
226
57
Total
429
220
208
OS UC
Model
Mean grade
191 ppm
cut-off grade of 55 ppm
Lower Cut-off Grade
14
cut-off grade of 100 ppm
cut-off grade of 55 ppm
Mt
U3O8
Mlbs
Measured
34
194
14
Indicated
362
188
150
Inferred
144
196
63
Total
540
191
227
Lower movements and accelerated production
Conventional truck and shovel open pit mining with radiometric scanning grade control
Fleet purchase and owner-operation assumed given the expected life and scale of Etango
LOM strip ratio reduced to 2.8:1 (from 3.3:1) due to:
–
Lower cut-off grades as a result of favourable cost and process parameters
–
Updated pit design guided by maximum DCF shell (compared to maximum CF shell in DFS)
Accelerated metal production in early years driven by:
–
Application of variable cut-off grade strategy
–
Lower grade ore is stockpiled initially and treated at back end of initial LOM
Material (Mt)
Strip ratio (x)
120
6.0
100
5.0
80
4.0
60
3.0
40
2.0
20
1.0
Millions
Ore (Mt)
25
Grade (ppm)
300
250
20
200
15
150
10
100
5
50
-
2035
2034
2033
2032
2031
2030
2029
2028
2027
2026
2025
2024
2023
2022
2021
2020
2035
2034
2033
Plant Feed Grade
2032
HG Stockpiles Feed
2031
2030
2029
2028
2027
Mar Grade Stockpile
2026
Direct Ore Feed
2025
2024
2023
Strip ratio
2022
15
Waste mined
2021
Ore mined
0
2020
0
LG Stockpile Feed
Heap leach processing
16
Large scale test work delivers integrity
–
180t treated to date through industrial-scale heap leach demonstration plant; outstanding results and genuine de-risking
–
Upside potential exhibited in the demonstration plant work has not been incorporated in the Optimised DFS
Orebody characteristics drive industry leading results
–
Rapid leach kinetics instrumental in driving project returns; over 90% extraction after 14 days
–
Relatively low acid consumption and strong geotechnical stability
Conventional HL process infrastructure
–
3 stage communition circuit includes 2 stage crushing followed by HPGRs
–
2 agglomeration drums with conveyor to “race-track style” stacking system
De-risked through the demonstration plant
17
Infrastructure rich
Grid operating power
–
NamPower proposed 35 MVA supply to Etango
following upgrade
–
Construction of new overhead line from site to
Kuiseb substation
–
Expected 36 month lead time from agreement
–
Construction power via diesel generators
Water
–
Roads
–
Well maintained access from Swakopmund
right through to Etango
Rail
–
18
Sourced from 20GLpa desalination plant at
Wlotzkasbaken, approximately 40km north of
Swakopmund; constructed to support Areva’s
Trekkopje project
Existing Walvis Bay to Swakopmund line runs
within approximately 30km of Etango
Established uranium and acid logistics
Uranium export mechanics
–
Walvis Bay is a uranium rated export port
–
Drummed U3O8 from Etango to be trucked 79km to Walvis Bay and shipped through the port
–
Established uranium sales regulatory framework
Acid
–
Sulphuric acid to be imported via Walvis Bay
–
Current and planned domestic acid plant investment by CGNPC (Husab), Vedanta (Scorpion) and Dundee Precious Metals
Required workforce, services and other infrastructure located in Swakopmund and Walvis Bay
–
Personnel with extensive uranium operating experience
Source: Dundee Precious Metals
19
Driving a large, long life project
Pre-production capex (DFS Op Study) = US$793M
DFS Opt Study
(Nov 2015)
DFS
(Apr 2012)
–
Reduced 9% (US$77M) from DFS estimate
Mining (including mine fleet)
131
127
–
Development capital intensity of US$110 per lb U3O8
annual production capacity is attractive when compared
to other large, long life uranium projects
Process plant
321
354
Site infrastructure
75
91
External infrastructure (power, water)
46
47
Miscellaneous (first fills, spares, etc)
31
29
Indirects (temporary services/infra, EPC, etc)
150
182
Owner’s costs
39
40
Total
793
870
Full purchase of mine fleet
–
Pre-production capital expenditure (US$M)
Indicative analysis shows potential to utilise equipment
leasing to reduce upfront capital by ~US$56M with a
~US$1.57/lb opex trade-off
20Mtpa heap leach infrastructure and process plant
Full funding of connection to grid power and water
infrastructure
Focused on value engineering targeting further
reduction in upfront capital
Sustaining capex (DFS Op Study) = US$282M
–
Reduced 26% (US$99M) from DFS estimate
–
Average ~US$18M per annum or ~US$2.50/lb
Intensity of shading represents relative stage of project study (lightest = SS/PEA complete,
medium = PFS complete, darkest = DFS complete)
20
Sharply lower operating costs
Operating cost breakdown (LOM estimate)
Etango operating costs (DFS Optimisation Study)
–
US$33/lb average in first 5 years (DFS estimate US$41/lb)
–
US$38/lb average LOM (DFS estimate US$46/lb)
Mining costs
–
US$1.69/t material mined over LOM
–
Drill and blast, truck and shovel; bulk mining methods
–
Strip ratio 2.8:1
–
Owner-mining estimate developed from first principles
Processing costs
–
US$6.79/t ore processed over LOM
–
Acid costs the largest contributor (US$93/t acid)
–
Power cost estimate of US$0.10/kWh derived from
prevailing pricing with an escalation factor of 2 times CPI
Other mi ning, 8%
Proces s labour,
4%
Other process,
1%
Sul phuric a cid,
13%
Mi ni ng labour,
5%
Rea gents (ex
a ci d), 9%
Owners costs, 7%
Ra w wa ter, 6%
Power, 10%
Ma i nt. materials
& cons umables,
8%
Dri l l and blast, 9%
Loa d, 6%
Ha ulage, 15%
Intensity of shading represents relative stage of project study (lightest = SS/PEA complete,
medium = PFS complete, darkest = DFS complete)
21
Etango indicative development timeline
Activity
H1
2016
H2
2016
H1
2017
H2
2017
H1
2018
HL Demonstration Plant
Value Engineering
DFS Update
Project Financing
Uranium Marketing
Project Approval
Detailed Engineering
Construction
Commissioning
Full Production
Subject to remaining study work, procurement of requisite sales contracts and project financing.
22
H2
2018
H1
2019
H2
2019
H1
2020
Project financing considerations
Expected precursors to future major U project financing
1.
Spot and term uranium price improvement
2.
Increased term market liquidity and depth
Equity participation from a downstream strategic investor logical at the Etango asset level
–
Project scale, simplicity and domicile deliver considerable competitive advantage in this respect
Project finance: detailed study drives financier comfort and 100% project ownership* delivers greater simplicity
High initial grade profile and rapid payback period also provide scope for enhanced potential debt terms
Etango project forecast cash flow (at US$75/lb U3O8)
100
500
0
0
-200
-500
-300
-400
-1000
-500
-600
-1500
Free cash flow (LHS)
Cumulative free cash flow (RHS)
3.00
2.50
2.00
1.50
1.00
40% geared (6% coupon)
40% geared (10% coupon)
50% geared (8% coupon)
60% geared (6% coupon)
60% geared (10% coupon)
40% geared (8% coupon)
50% geared (6% coupon)
50% geared (10% coupon)
60% geared (8% coupon)
^ Five year sculpted repayment; ignores benefit of tax shield on interest payments
* Minority project interest purchase remains subject to shareholder approval
23
2025
1000
2024
200
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
Free ca sh flow (US$M)
300
3.50
2023
1500
2021
400
-100
4.00
2000
Cumul ative free cash flow (US$M)
500
Free cash flow / (Principal & Interest payments)^
2022
–
Appendix 1: Etango production profile
Production
(Mlbs)
Feed grade
(ppm)
12
300
10
250
8
200
6
150
4
100
2
50
Production (Mlbs U3O8)
24
Plant feed grade (ppm)
2035
2034
2033
2032
2031
2030
2029
2028
2027
2026
2025
2024
2023
2022
2021
2020
0
Appendix 2: U spot price forecasts and Etango economics
Historically long term contract premiums have averaged 23% although they decrease with increasing spot prices. The long term contract premium when
spot prices were in the range of US$65/lb to US$75/lb averaged 14%.
25
Appendix 3: Debt free with 100% of Etango*
A$6M CASH
(royalty)
RESIDUAL 20%
HOLDING IN
ETANGO PROJECT
A$3M CASH
(placement)
RESOURCE
CAPITAL FUNDS
BANNERMAN
RESOURCES
PROJECT
VENDORS
106.7M SHARES
(A$8M notes
convert @ A7.5c)
A$1M CASH
A$4M CASH
(remaining A$4M
notes repaid)
123.4M SHARES
1.5% ETANGO
GROSS REVENUE
ROYALTY
63.3M SHARES
(equity placement
@ A4.74c)
* The transactions outlined above remain subject to shareholder approval; if approved, Bannerman will hold zero corporate debt and will own
100% of Bannerman Mining Resources (Namibia) Pty Ltd (holder of a 100% interest in the Etango uranium project)
26
Appendix 4: Peer project comparatives
Etango is one of the most significant uranium projects not owned by a major
20
18
16
14
12
10
8
6
4
2
0
Ranger
27
Mulga Rock
Intensity of shading represents relative stage of project operation or development (darkest = operating mine, medium = in
construction, lightest = study phase)
Salamanca
Rössing
Letlhakane
COMINAK
Budenovskoye 1, 3 & 4
Rabbit Lake
Central Mynkuduk
Inkai
Langer Heinrich
Priargunsky
Norasa
South Inkai
Budenovskoye 2
Yeleerie
Kintyre
SOMAIR
Triple R
Etango
Olympic Dam
Tortkuduk
Husab
Cigar Lake (full)
McArthur River
Pro forma 2014 ura nium production (mlbs pa)
Appendix 5: Resources & Reserves disclosures
Etango Project – Mineral Resource Estimate
Mineral Resource
Measured
Nov 2015
Deposit
Indicated
Inferred
Cut Off
Tonnes
Grade
In-situ
Tonnes
Grade
In-situ
Tonnes
Grade
In-situ
Grade
(Mt)
(U3O8
U3O8
(Mt)
(U3O8
U3O8
(Mt)
(U3O8
U3O8
ppm)
(Mlbs)
ppm)
(Mlbs)
ppm)
(Mlbs)
194
14.4
188
150.2
144.5
196
62.5
(U3O8
ppm)
Etango1
55
Ondjamba2
100
85.1
166
31.3
Hyena3
100
33.6
166
12.3
263.2
182
106.1
Total
33.7
33.7
194
14.4
362
362
188
150.2
Note 1: Refer to the Competent Persons Statement at the end of this document for further information on the Etango Mineral
Resource Estimate. The Etango estimate has been reported in accordance with JORC 2012. The figures may not add due to rounding.
Note 2 & 3: Refer to the Competent Persons Statement at the end of this document for further information on the Ondjamba and
Hyena Mineral Resource Estimates. The Ondjamba and Hyena estimates remain unchanged from the previous declaration and
therefore have been reported in accordance with JORC 2004. The figures may not add due to rounding.
28
Appendix 5: Resources & Reserves disclosures
Etango Project – Ore Reserve Estimate
Ore
Reserve
Nov 2015
Deposit
Etango
Proved
Probable
Total
Tonnes
Grade
In-situ
Tonnes
Grade
In-situ
Tonnes
Grade
In-situ
(Mt)
(U3O8
U3O8
(Mt)
(U3O8
U3O8
(Mt)
(U3O8
U3O8
ppm)
(Mlbs)
ppm)
(Mlbs)
ppm)
(Mlbs)
196
14
195
116.1
195
130.1
32.3
271
303.3
Competent person’s statement